Planning artifacts for v5.0.0 (token-economy round): - v5-brief.md: scope brief with 22 items (F1-F7 + M1-M8 + N1-N7), revised with Avklaringer-section after critical review (N7 dropped, M3+N6 merged, N5 promoted to v5.0.0, SC-6/SC-10 reformulated) - v5-plan.md: 31-step implementation plan in 5 sessions (alpha.1 → alpha.2 → beta.1 → rc.1 → release). B+ score (84/100) after plan-critic + scope-guardian review addressed all blockers/majors/gaps. - v5-implementation-log.md: per-session status record (skeleton) Sessions track via state files (REMEMBER.md, TODO.md gitignored; implementation-log.md committed; NEXT-SESSION-PROMPT.local.md gitignored). No code changes in this commit — planning only.
2.4 KiB
2.4 KiB
config-audit v5.0.0 — Implementation Log
Per-session record of what was done, what was deferred, and what failed.
Written at the end of each session. State for the next session lives in
NEXT-SESSION-PROMPT.local.md (gitignored).
Planning session (2026-05-01)
Outcome: Plan ready for execution.
Completed:
- Read
v5-brief.md(drafted 2026-04-19) - Brief reviewer ran — 5 findings requiring user input
- User decisions captured:
- N7 (cache-hit-digest) dropped from v5.0.0 — moved to post-release
- N5 (live tokenizer) moved into v5.0.0 with warn-and-fallback
- M3 merged into N6 (single collision scanner)
- M1 manifest-fallback approach approved (cache → package.json → "tool count unknown" finding)
- SC-6 split to 6a/6b
- SC-10 replaced with per-feature coverage requirement
- N1 backward-compat for
CA-TOK-*glob suppression flagged in CHANGELOG
- Brief revised with "Avklaringer fra konsultasjon 2026-05-01" section (authoritative)
- Exploration: 7 parallel agents (architecture, task-finder, dependency-tracer, risk-assessor, test-strategist, git-historian, convention-scanner)
- Plan written:
docs/v5-plan.md— 31 steps in 5 sessions - Adversarial review: plan-critic verdict REPLAN (Grade C, 5 blockers + 8 majors); scope-guardian MIXED (4 gaps)
- Plan revised to address all 5 blockers + 8 majors + 4 scope-gaps; new score B+ (84/100)
Open assumptions (carry into execution):
- Anthropic
count_tokensendpoint accepts plain-text payload, returns{input_tokens: number}(Step 26) - MCP servers expose tool count via
tools/listorpackage.jsontoolsfield (Steps 14, 18) readActiveConfigperformant enough for TOK at scale (Step 6)- Cross-plugin namespace model — to be verified by Step 22a research spike before Step 22b
baseline-all-afixture is genuinely info-only after F3 — Step 3 audit verifies
Next session: Session 1 — alpha.1 (F1-F5 + reference cleanup). See NEXT-SESSION-PROMPT.local.md.
Session 1 — alpha.1 (TBD)
Start when ready. Replace this stub with actual log at session end.
Steps planned: 1-9 (incl. 8b)
Branch strategy: direct-to-main (Forgejo, pre-authorized).
Session 2 — alpha.2 (TBD)
Steps 10-17.
Session 3 — beta.1 (TBD)
Steps 18, 19, 20, 21, 22a, 22b, 23.
Session 4 — rc.1 (TBD)
Steps 24-27.
Session 5 — release (TBD)
Steps 28-30, including SC-6b release gate.