Kjell Tore Guttormsen 0e18a6c0a9 docs(plan): add cross-phase execution ordering
Sequences the remaining roadmap (Stage 0 guard gate -> Phase 2 -> Phase 3
-> Phase 4) with the quality rationale for the order: guard readiness
verified before any Phase 2 code, Phase 2 split guard-independent-first,
Phase 3's configurability extracted only after two concrete consumers
exist, Phase 4 code last on a frozen contract with its coordination
started early. Connective tissue over the four per-phase plans; owns the
order and reasons, not the phase detail.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01HBbjgS5A55RVavoyjJC4FX
2026-07-24 20:01:45 +02:00

122 lines
6.5 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Execution order — the full roadmap, sequenced
Status: approved sequencing across all remaining phases. This doc is the
connective tissue between the per-phase plans; it owns the *order and the
reasons*, not the phase detail. Each phase's detail and verification live in its
own doc:
- `docs/plan/phase-1-door-a.md` — DONE, shipped at v0.3.2.
- `docs/plan/phase-2-doors-b-c.md`
- `docs/plan/phase-3-configurable-contract.md`
- `docs/plan/phase-4-node-half.md`
Headline order: **Stage 0 (guard gate) → Phase 2 → Phase 3 → Phase 4 code**,
with Phase 2 split guard-independent-first and Phase 4's *coordination* started
in parallel from the beginning. The quality argument for this order is below —
it is not merely the roadmap numbering.
## Stage 0 — Guard readiness (gate; do first, cheap)
Before any Phase 2 code, confirm `llm-ingestion-guard` 0.2 exists with the
pinned surface (`prepare_input`, `screen_output`, `okf.import_bundle`,
disposition enum) and is installable in CI. This is Phase 2's assumptions
B1+B2; B2 is explicitly "not yet decided", and the guard is a separate repo
(`open/llm-ingestion-pipeline-security`), so its readiness is partly outside
this repo's control.
Why first: it is the single biggest unknown, it is cheap to check (read the
guard repo), and its answer decides the *shape* of Phase 2 — run straight
through, or front-load the guard-independent half while readiness is confirmed
in parallel. Do not build a bearing dependency into the plan on an unverified
foundation. If the surface has drifted from what the plan assumes, the whole
persist-gate design must know now, not at the integration step.
Outcome recorded in STATE before Phase 2 code starts.
## Phase 2 — Doors B/C (split: guard-independent first)
Internal order follows the phase-2 doc's TDD steps, deliberately:
1. **Guard-independent half (steps 12):** extraction registry (stdlib core
types, fail-fast on unknown extension and on `[extract]` types without the
extra) + provenance rendering and filename slugging (pure functions). Zero
external dependency, maximal test-determinism, reuses the Phase 1 renderer.
Highest-quality-yield work to start with; validates B3 (`html.parser`
adequacy) early while it is cheap to change.
2. **Guard seam (steps 35):** Door B against a *stub* guard first (nail the
disposition control flow deterministically), then integration with the *real*
guard, then Door C. Stub-first means that when the real-guard integration
test is the only thing that can newly fail, a failure isolates cleanly to the
integration boundary. Door B before Door C: C reuses B's guard-gate pattern
and both reuse Phase 1 primitives.
This is where `pyproject` runtime deps become exactly the guard pin — a
semver-worthy event (propose 0.4.0), its own CHANGELOG entry.
## Phase 3 — Configurable bundle contract (only after 2)
Extract configurability only once Door A **and** Door B/C both concretely use
the type/layer/frontmatter/reserved-file constants. Phase 3 abstracts a pattern;
you need ≥2 real consumers before the right seams are visible. Building the
config object first would be speculative abstraction — an explicit anti-pattern.
The proving consumer (`claude-code-llm-wiki`, `strict-v1`) is the concrete
second profile that proves the abstraction is not single-use.
The 2→3 boundary has no painful retrofit: Phase 2 already leaves the seam open —
Door C v1 deliberately does NOT persist the guard log "because reserved-file
policy differs per consumer and becomes configurable in Phase 3." This is where
the contract becomes explicit and frozen — the precondition for a clean Node
port.
## Phase 4 — Node half (two clocks)
**Coordination clock — start early, parallel to Stages 03, but only the
shape-independent agreements.** Phase 4's hard preconditions are agreements, not
code: okr's reference-impl lift *in principle*, catalog as re-pin owner,
guard-as-contract at the Node persist seam, and the linkedin-studio
non-normalization carve-out can all be initiated early — via coord — so they are
settled when code starts. The one agreement that must WAIT is the exact
second-brain *contract shape*: the phase-4 doc ties the catalog-spec
expressiveness check to Phase 3's split-table step, so do not freeze the
cross-runtime contract before Phase 3 has proven the profile can express it.
**Code clock — last.** The Node/ESM implementation ports a *frozen, explicit*
contract (Phase 3's output) and uses the shared fixture suite as the
cross-runtime conformance oracle. Porting before the contract is frozen means
chasing a moving target and guaranteed drift between halves. Halves share
contract and fixtures, never code.
## Quality spine (holds across every stage)
- TDD iron law throughout: no production code without a failing test first.
- The golden/fixture suite is the backbone — every phase extends it; it is the
regression oracle and, in Phase 4, the cross-runtime conformance oracle. It
never goes non-byte-exact.
- Determinism invariant every phase (explicit `ingested_at`, LF-only,
byte-exact). Phase 2 adds: the guard *version* is part of the input surface —
pin it.
- Boundary grep-gate green every phase: `grep -rn "sanitize\|quarantine\|lexicon"
src/` empty (guard imports only).
- One phase = one release with a CHANGELOG entry; the guard dependency landing in
Phase 2 is the architectural milestone.
## Verification — the gate between each handoff
These are the objective checks that a stage is done and the next may begin:
1. **Enter Phase 2:** guard readiness recorded in STATE — either "0.2 API
matches + installable in CI" or an explicit "front-load guard-independent
half; guard integration blocked on <named item>".
2. **Phase 2 → Phase 3:** Phase 1 golden suite still byte-for-byte; `pyproject`
runtime deps == exactly `llm-ingestion-guard>=0.2,<0.3`; persist-gate proof
test green (a fail-secure fixture yields zero new files).
3. **Phase 3 → Phase 4:** golden suite byte-identical under `DEFAULT`
(`git diff --stat examples/` empty for the phase); `STRICT_V1` cross-profile
rejection tests pass both directions; split-table artifact under `docs/`
reviewed with the operator (contract is frozen and expressive enough for the
second-brain spec).
4. **Phase 4 code start:** each shape-independent coordination step has a
recorded sign-off; the contract-shape agreement is signed off *after* the
Phase 3 split-table, not before.
5. **Throughout:** `mypy --strict src/`, `ruff check .`, `ruff format --check .`
clean; boundary grep-gate empty.