ms-ai-architect/playground/test-fixtures/summary.md
Kjell Tore Guttormsen 2e9bc5e0bb
fix(playground): align the demo project description with its reports
The demo project card now describes the system the 17 demo reports are about: a citizen chatbot that pre-assesses applications for municipal housing allowance (bostøtte) from uploaded attachments. It previously described a building-permit (byggesak) chatbot that no report mentions.

Six fixtures (classify, requirements, conformity, review, adr, summary) are set equal to the corrected text already inlined in the demo block: the Annex III deadline 2027-12-02 and the 2026-08-02 transparency label, instead of 2027-08-02. Chose syncing the fixtures to the block over editing the block by hand, because the block is build output and a rebuild from the old fixtures would have put the wrong deadlines back in the demo.

Rebuilt the demo state and regenerated the 24 screenshots once with tests/screenshot/run.mjs; MANIFEST.json matches the new demo state.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-23 15:06:19 +02:00

1.3 KiB

Beslutningsnotat — Acme Kunde-chatbot

System: Acme Kunde-chatbot (Acme Kommune) Dato: 2026-04-30 Til: Direktør for Digital og IT Fra: AI-teamet

Verdict

Verdict: warning Sub: Pilot anbefalt med betingelser

Rationale

Arkitekturen er teknisk solid og økonomisk forsvarlig (P50 NOK 1.7M/år), men compliance-arbeidet ligger 6 måneder bak ideell tidslinje. Pilot kan starte etter at FRIA og transparens-instruksjoner er ferdigstilt; full produksjonssetting krever lukking av alle critical funn fra arkitekturgjennomgang.

Key Metrics

Metric Verdi Mål
Compliance-dekning 33% (4/12 fullt møtt) 100% innen 2027-12-02
Sikkerhetsscore 22/30 (73%) ≥27/30 (90%)
TCO 3 år NOK 6.7M ≤ NOK 7M
Saksbehandlingstid (pilot) -32% (estimert) -40%
ROS-restrisiko medium low-medium

Next Steps

  • Lukk F-01 (ABAC) innen 2026-06-15
  • Gjennomfør FRIA innen 2026-07-15 (Art. 27-frist)
  • Produksjonsdokumentere transparens-instruksjoner innen 2026-09-01
  • Pilot i 3 bydeler Q4 2026
  • Full utrulling Q2 2027

Restrisiko

Etter foreslåtte tiltak: medium. Hovedeksponering: bias mot henvendelser på andre språk enn norsk krever løpende monitoring.

Anbefaling

Godkjenn pilot-fase med tydelig stage-gate til full produksjonssetting. Avstem med Datatilsynet før fase 4.