The demo project card now describes the system the 17 demo reports are about: a citizen chatbot that pre-assesses applications for municipal housing allowance (bostøtte) from uploaded attachments. It previously described a building-permit (byggesak) chatbot that no report mentions. Six fixtures (classify, requirements, conformity, review, adr, summary) are set equal to the corrected text already inlined in the demo block: the Annex III deadline 2027-12-02 and the 2026-08-02 transparency label, instead of 2027-08-02. Chose syncing the fixtures to the block over editing the block by hand, because the block is build output and a rebuild from the old fixtures would have put the wrong deadlines back in the demo. Rebuilt the demo state and regenerated the 24 screenshots once with tests/screenshot/run.mjs; MANIFEST.json matches the new demo state. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
30 lines
2 KiB
Markdown
30 lines
2 KiB
Markdown
# Arkitekturgjennomgang — Acme Kunde-chatbot
|
||
|
||
System: Acme Kunde-chatbot (Acme Kommune)
|
||
Vurderingsdato: 2026-04-30
|
||
Reviewers: AI-arkitekt, sikkerhetsarkitekt, Datatilsynet
|
||
|
||
## Funn
|
||
|
||
| ID | Severity | Status | Lokasjon | Anbefaling |
|
||
|----|----------|--------|----------|------------|
|
||
| F-01 | critical | remove | Authentication layer | Tilgang til AI-forklaringer mangler attribute-based access control — alle saksbehandler ser alle saker. Implementer ABAC basert på sak-tildeling. |
|
||
| F-02 | high | review | Data pipeline | Treningsdata oppdateres månedlig, men ingen formell drift-deteksjon. Etabler statistisk drift-monitoring i Azure Monitor. |
|
||
| F-03 | high | review | Model serving | Modellen serves fra en enkelt regional endpoint uten failover. Replikér til en sekundær region for RTO < 1t. |
|
||
| F-04 | high | review | Logging | Audit-logg lagres 30 dager — under arkivlovens krav for sak-relevant info. Endre retensjon til 7 år for sak-knyttede oppslag. |
|
||
| F-05 | medium | keep | Cost management | Ingen budsjettalarmer på Azure AI Services — prediction-kostnaden kan øke med 4× ved belastnings-topper uten varsel. |
|
||
| F-06 | medium | review | Compliance | FRIA-rapport ikke vedlikeholdt etter modell-endring 2026-03-12. Re-evaluering trengs. |
|
||
| F-07 | medium | keep | UX | saksbehandler-grensesnitt viser ikke konfidensgrad tydelig nok — risiko for over-trust på AI-output. |
|
||
| F-08 | low | suppressed | Documentation | README mangler oppdatert arkitekturdiagram (siste fra 2025-11). |
|
||
| F-09 | low | suppressed | Testing | Manglende E2E-test for henvendelser på andre språk. |
|
||
|
||
## Sammendrag
|
||
|
||
Critical (1): ABAC mangler — må fikses før idriftsettelse.
|
||
High (3): Drift-deteksjon, failover, logg-retensjon — må fikses innen 6 mnd.
|
||
Medium (3): Budsjett, FRIA-revisjon, UX-konfidens — bør fikses innen 12 mnd.
|
||
Low (2): Dokumentasjon, testing — opportunity-quality.
|
||
|
||
## Anbefaling
|
||
|
||
Idriftsettelse anbefales IKKE før F-01 er løst. F-02 til F-04 må adresseres innen 2026-09-01 for å holde 2027-12-02-fristen.
|