portfolio-optimiser/shared/examples/bygg-energi-mikro/kilder-realiseringsgap.md
Kjell Tore Guttormsen ecd83066fb feat(shared): S4 — re-introduce shared/ as subtree of portfolio-optimiser-commons
commons (ktg/portfolio-optimiser-commons @ 7d2b46c) is now the source of
truth for the framework-neutral shared core; this repo consumes it via
git subtree (--squash) at the unchanged shared/ path.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01AaQCFnfsh3tfq1VfzdJpoi
2026-07-03 05:36:01 +02:00

46 lines
3.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
type: reference
title: "Realiseringsgrad og energy performance gap — verifisert litteratur"
description: "Kildebelagte tall for gapet mellom modellert og faktisk realisert besparelse, og dets systematiske årsaker. Grunnlaget for verdict-frøets realiseringsgrad."
tags: [realization-rate, performance-gap, M&V, evaluering, kilder]
timestamp: 2026-06-29
---
# Realiseringsgrad (realization rate) — verifisert litteratur
**Realiseringsgrad (RR)** = faktisk evaluert besparelse (ex-post) ÷ modellert/påstått
besparelse (ex-ante). RR < 1 betyr at drift leverte mindre enn modellen lovte. Avviket
kalles *energy performance gap*. Alle tall under er verifisert mot primærkilde [V].
| Nivå | Funn | Kilde |
|---|---|---|
| Program (regulatorisk default) | Default gross RR **0,90** for kWh/kW/therm; ex-ante «generally over-estimated» | CPUC Resolution E-4952 |
| Program (lys, drift lavere) | Operational adjustment ned til **81,1 %** (metrede driftstimer 15 % lavere); coincidence factor **0,566** vs antatt 1,0 | National Grid SBS 2010 (DNV KEMA) |
| Program (lys, drift høyere) | Hours-of-Use RR **106,5 %**; coincidence 72,2 % — gapet går **begge veier** | Massachusetts Impact Evaluation 2010 |
| Parameter (driftstimer) | Metret **3 053 t/år** vs antatt **3 772 t/år** (≈19 % lavere); CV ≈ 0,5 | Efficiency Maine 2021 |
| Portefølje | Commercial lighting **98 %** vs residential **61 %** vs total **93 %** | LADWP Retrospective FY15/1619/20 |
| Bygg (grønne næringsbygg) | Predikert besparelse **1,53×** realisert; ~⅓ av LEED-bygg bruker mer energi | "Mind the energy performance gap", ScienceDirect |
| Måleterskel | Besparelse bør overstige **~10 % av baseline** for å skilles pålitelig fra støy | FEMP/RDH M&V-veiledning |
## Systematiske årsaker (hvorfor faktisk < modellert) [V]
1. **Driftstimer / Hours-of-Use** — dominerende. Timeplan-baserte estimat (det Option A
stipulerer) treffer sjelden metret brenntid (3 053 vs 3 772).
2. **Baseline- og værjustering** — over-predikert baseline blåser opp absolutt besparelse.
3. **Coincidence / diversity factor** — for effekt(kW): andel last under nett-topp ~0,570,72, ikke 1,0.
4. **HVAC interactive effects** — mindre spillvarme → endret kjøle-/varmebehov; «too small to measure», stipuleres.
5. **In-service rate, drift & persistens** — ikke alt installeres/forblir; styringer overstyres; degradering.
6. **Måleusikkerhet** — under ~10 %-terskelen drukner signalet i støy.
7. **Rebound / atferd** — mer lys på, lengre, fordi det «koster mindre».
## Kilder (URL)
- EVO IPMVP Generally Accepted M&V Principles (okt. 2018): https://evo-world.org/images/corporate_documents/IPMVP-Generally-Accepted-Principles_Final_26OCT2018.pdf
- DOE/NREL Uniform Methods Project, Ch. 2 Commercial & Industrial Lighting (NREL 68558): https://docs.nrel.gov/docs/fy17osti/68558.pdf
- Massachusetts Impact Evaluation of 2010 Prescriptive Lighting: https://ma-eeac.org/wp-content/uploads/Impact-Evaluation-of-2010-Prescriptive-Lighting-Installations-Final-Report-6-21-13.pdf
- National Grid SBS 2010 Prescriptive Lighting (DNV KEMA): https://www.nationalgridus.com/media/pdfs/our-company/eereports/2014-ngrid-sbs-impact-eval-final-prot.pdf
- Efficiency Maine Retail & Distributor Lighting 2021: https://www.efficiencymaine.com/docs/Retail-and-Distributor-Lighting-Final-Impact-Evaluation-Report-2021.pdf
- LADWP Retrospective Impact Evaluation FY15/1619/20: https://www.ladwp.com/sites/default/files/2024-01/LADWP%20Retrospective%20Report%20FINAL%20V4.pdf
- CPUC Resolution E-4952: https://docs.cpuc.ca.gov/publisheddocs/published/g000/m232/k459/232459122.pdf
- "Mind the energy performance gap" (ScienceDirect): https://www.sciencedirect.com/science/article/abs/pii/S0921344918303860
- SSB Elektrisitetspriser (kraftpris tjenesteytende næringer, Q1 2026): https://www.ssb.no/energi-og-industri/energi/statistikk/elektrisitetspriser