Independent post-hoc review (high-effort) of the Fase 2 vertical slice (scope 9973d9f..308b553, 32 files). Two independent reviewers converged, ground-truth-verified against source: - F1 BLOCKER (run.py:124): maker-checker debate output discarded; the validated proposal comes from a separate generate_via_llm call. - F2 BLOCKER (budget.py:81): BudgetMiddleware defined+tested but never wired onto the debate; the NFR short-circuit path is absent. - F7/F3/F4/F8/F5 MAJOR, F9 MINOR. The slice's three load-bearing seams are built + unit-tested but not connected by the orchestrator; the green e2e suite asserts proposal shape only. Fase 2 not closed — awaits operator decision. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01Fif1r1En5W542HbZV88yMH |
||
|---|---|---|
| .. | ||