Independent post-hoc review (high-effort) of the Fase 2 vertical slice
(scope 9973d9f..308b553, 32 files). Two independent reviewers converged,
ground-truth-verified against source:
- F1 BLOCKER (run.py:124): maker-checker debate output discarded; the
validated proposal comes from a separate generate_via_llm call.
- F2 BLOCKER (budget.py:81): BudgetMiddleware defined+tested but never
wired onto the debate; the NFR short-circuit path is absent.
- F7/F3/F4/F8/F5 MAJOR, F9 MINOR.
The slice's three load-bearing seams are built + unit-tested but not
connected by the orchestrator; the green e2e suite asserts proposal
shape only. Fase 2 not closed — awaits operator decision.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Fif1r1En5W542HbZV88yMH