docs: review log part 30, changelog and project notes

Part 30 covers critique round 9c, the rest from 9a and 9b, the
fresh-reader test (round 9d), the explanation of the direction of the
discount rate and what was corrected, with what the session checked
itself and what it did not.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
Kjell Tore Guttormsen 2026-11-23 18:29:10 +01:00
commit 09c46c08cd
Signed by: ktg
SSH key fingerprint: SHA256:JakMjO6FTBBzN0Bhfj9saOoEjaFxlSdYuZQQpM/lF9Q
3 changed files with 348 additions and 12 deletions

View file

@ -9,7 +9,8 @@ test, not advocacy: the conclusion may be "only under these conditions" or "no".
policy advisers and decision makers, so report, summary, slides, README and plugin texts are Norwegian (bokmål);
code, code comments and this file are English.
Deliverables mirror `~/repos/den-dynamiske-rettsstaten`: full report with the whole model, 2-page summary, LinkedIn
Deliverables mirror the project `den-dynamiske-rettsstaten`
(`https://git.fromaitochitta.com/open/den-dynamiske-rettsstaten`): full report with the whole model, 2-page summary, LinkedIn
carousel, Python code, and a Claude plugin (own repo, later).
## Stack
@ -18,10 +19,13 @@ carousel, Python code, and a Claude plugin (own repo, later).
avoided emissions and cooling water; 27a and 27b fourth round, what researchers and expert bodies say
about series building, reactor size, timelines, power purchase agreements and the state's role, made
after the freeze and feeding no parameter; 28 the deals and cost figures the critics of round 9c pointed to
2026-11-23, made after the results, feeding no parameter and used only in the report text).
2026-11-23, and K28-011, IEA on Barakah, from reading round 9d the same day; 11 entries, made after the
results, feeding no parameter and used only in the report text).
Every model parameter must trace to an entry here.
- `FORHANDSREGISTRERING.md`: the approved direction and pre-registered criteria (M1–M7). Committed.
- `modell/spesifikasjon.md`: the model specification (equations S1–S54; chapter 17, the addition to the
- `modell/spesifikasjon.md`: the model specification (equations S1–S54; clarification 143, 2026-11-23, corrects the
sentence of chapter 2 on interest during the data centre's construction, which pulls against the programme
in net present value and is not computed; chapter 17, the addition to the
direction, is coded all the way: solution T through the build-out, the power system, the cash flow, the
levelised cost, ownership, scale, M5 and the verdicts, and S48–S54).
`modell/parametere.json`: the frozen
@ -201,7 +205,7 @@ carousel, Python code, and a Claude plugin (own repo, later).
(17.8) were frozen in the deviation of 2026-11-12 and stand last in the parameter file.
- **Known-answer tests:** nothing is tuned to make one pass. A miss stays in the suite as a strict `xfail` with
the measured deviation and the cause if known, and is reported in the review log.
- **Part 6 has begun (2026-11-14):** the main run on the frozen numbers was started from a separate copy of
- **Part 6 is done (the main run, 2026-11-14):** the main run on the frozen numbers was started from a separate copy of
the code (`private/kjoring-del6/kode`, a git worktree on the commit the run is made from; never edit it while
a run goes: the worker processes read the code from disk). It writes to `data/resultater/`. Clarification 140
fixes how: one command writes the five files one at a time, `dommer.json` first; a seventh and an eighth
@ -220,11 +224,21 @@ carousel, Python code, and a Claude plugin (own repo, later).
run's verdicts («normalisering», the step the verdicts are read on), M7 without a verdict and the main
known limitations, every measured number with `\tall{key}`. Chapter 7 builds on area 27 of the source bank
and names no company; chapter 9 renders chapters 13 and 17.9 of the specification with the wording after
the change of the hypothesis. Chapter 8 lists seven things the specification says shall be reported that
are not computed (build-out with stopping, the two terms of S19, what households and businesses pay, the
split of A against B′, spent fuel, the need for labour and capital, the table per price area), the seven
known-answer misses, three notes on the frozen parameter file (review log part 29), and two observations from area 27 outside the frozen ranges in favour of nuclear
power (review log part 25). Chapters 3 to 5 were read against the specification by independent readers
the change of the hypothesis. Chapter 8 holds the two findings from the expert bodies that the frozen
ranges do not cover (review log part 19); the observations in the other direction from area 27 (learning,
where three estimates lie above the upper bound of the learning rate, and build time; review log part 25)
and three costs below the range for a large reactor (Olkiluoto 3 and Saeul 1–2 from area 28, Barakah from
K28-011 and K03-011), none of them computed in, set against the budget reading of the cost range and row 1; three
notes on the frozen parameter file (review log part 29); seven things the specification says shall be
reported that are not computed (build-out with stopping, the two terms of S19, what households and
businesses pay, the split of A against B′, spent fuel, the need for labour and capital, the table per price
area); the seven known-answer misses; and fourteen calculations the critics of round 9c and the readers of
round 9d asked for that are not done, with their direction where it is known (among them interest during the
data centre's construction, clarification 143). Chapters 6 and 8 explain the direction of the interest rate
(S26 discounts from 2027, so a loss that lies years ahead shrinks with a higher rate): explained for rows 3, 4
and 23 and surface (c), partly for rows 16 and 24; the split by term on the frozen numbers, row 24 on the frozen
numbers and row 37 are said outright to be not explained. The checks behind it (the made-up basis term by term,
the committed tools on the first 200 frozen draws) are in review log part 30, not in the result files. Chapters 3 to 5 were read against the specification by independent readers
2026-11-14. Appendix B (the 137 parameters and the 37 lines of the sensitivity list) and the
reference list are generated by `rapport/lag_vedlegg_parametere.py` and `lag_referanser.py` into
`rapport/generert/` (run by `bygg.sh`, the reference list last; neither is edited by hand). Appendix C
@ -235,13 +249,13 @@ carousel, Python code, and a Claude plugin (own repo, later).
holds every entry cited with `\kilde{...}` or in the parameter file, and every entry the `Kilde` field of
a listed entry points to, with the entry's title and `Kilde` field without the work notes (`ARBEIDSNOTATER`:
local copies, tool names, who added it; a trace left stops the script); a cited entry without a confirmed `Kontroll` line stops the script. `\kilde` links each id to its
item (ranges are written `K27-008 til K27-011`). `rapport/notat.tex` is the two-page summary and
item (ranges are written `K27-008 til K27-011`). `rapport/notat.tex` is the two-page summary (set in 10 pt since 2026-11-23 to stay on two pages) and
`rapport/kap10-konklusjon.tex` the conclusion chapter. They, `sammendrag.tex`, the opening of chapter 1 and
`README.md` are written for a reader who does not know the project (the operator's requirement
2026-11-14): the answer first, the few numbers that carry it, what could change it and what was learned,
after the approved wording of `innspill/`; the equations and the argument of chapters 2 to 9 stay as they
are. Every measured number in them is still a `\tall` key (in the README typed as the key renders it). The built PDFs are copied to `pdf/` (the report is
marked «utkast»). The carousel (`rapport/karusell.tex`, 28 slides, xelatex; built 2026-11-22, copied to `pdf/Tokenfabrikker_karusell.pdf`) follows the text the operator approved that day, verbatim, with the nine corrections and the page count he approved 2026-11-23 after reading round 9a (review log part 28; `private/del9-rapporter/9a/`); every measured number in it is a `\tall` key, also in the figures, and `rapport/resultater/karusell.py` adds the keys that begin with `karusell.` and writes the figure geometry (dots, bars, staircase, timeline) to `rapport/generert/karusell-*.tex`. A change of wording on a slide needs the operator's yes. The PDFs
marked «utkast»). The carousel (`rapport/karusell.tex`, 28 slides, xelatex; built 2026-11-22, copied to `pdf/Tokenfabrikker_karusell.pdf`) follows the text the operator approved that day, verbatim, with the nine corrections and the page count he approved 2026-11-23 after reading round 9a (review log part 28; `private/del9-rapporter/9a/`); every measured number in it is a `\tall` key, also in the figures, and `rapport/resultater/karusell.py` adds the keys that begin with `karusell.` and writes the figure geometry (dots, bars, staircase, timeline) to `rapport/generert/karusell-*.tex`. A change of wording on a slide needs the operator's yes: the working copy of `rapport/karusell.tex` holds the changes proposed after rounds 9c and 9d (review log part 30), a proposal until the operator says yes, and `pdf/` keeps the approved carousel. Critique round 9c, what stood open from 9a and 9b, and reading round 9d with six new readers are review log part 30. The PDFs
are not tagged for universal design (review log part 26).
- **Chapter 6 (the results) is generated from the result files.** `rapport/lag_resultater.py` runs the
modules in `rapport/resultater/` (`dommer`, `tidslinje`, `miljo`, `eierformer`, `terskler`, `folsomheter`;