docs: review log part 30, changelog and project notes
Part 30 covers critique round 9c, the rest from 9a and 9b, the fresh-reader test (round 9d), the explanation of the direction of the discount rate and what was corrected, with what the session checked itself and what it did not. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
This commit is contained in:
parent
6443c4f151
commit
09c46c08cd
3 changed files with 348 additions and 12 deletions
36
CLAUDE.md
36
CLAUDE.md
|
|
@ -9,7 +9,8 @@ test, not advocacy: the conclusion may be "only under these conditions" or "no".
|
|||
policy advisers and decision makers, so report, summary, slides, README and plugin texts are Norwegian (bokmål);
|
||||
code, code comments and this file are English.
|
||||
|
||||
Deliverables mirror `~/repos/den-dynamiske-rettsstaten`: full report with the whole model, 2-page summary, LinkedIn
|
||||
Deliverables mirror the project `den-dynamiske-rettsstaten`
|
||||
(`https://git.fromaitochitta.com/open/den-dynamiske-rettsstaten`): full report with the whole model, 2-page summary, LinkedIn
|
||||
carousel, Python code, and a Claude plugin (own repo, later).
|
||||
|
||||
## Stack
|
||||
|
|
@ -18,10 +19,13 @@ carousel, Python code, and a Claude plugin (own repo, later).
|
|||
avoided emissions and cooling water; 27a and 27b fourth round, what researchers and expert bodies say
|
||||
about series building, reactor size, timelines, power purchase agreements and the state's role, made
|
||||
after the freeze and feeding no parameter; 28 the deals and cost figures the critics of round 9c pointed to
|
||||
2026-11-23, made after the results, feeding no parameter and used only in the report text).
|
||||
2026-11-23, and K28-011, IEA on Barakah, from reading round 9d the same day; 11 entries, made after the
|
||||
results, feeding no parameter and used only in the report text).
|
||||
Every model parameter must trace to an entry here.
|
||||
- `FORHANDSREGISTRERING.md`: the approved direction and pre-registered criteria (M1–M7). Committed.
|
||||
- `modell/spesifikasjon.md`: the model specification (equations S1–S54; chapter 17, the addition to the
|
||||
- `modell/spesifikasjon.md`: the model specification (equations S1–S54; clarification 143, 2026-11-23, corrects the
|
||||
sentence of chapter 2 on interest during the data centre's construction, which pulls against the programme
|
||||
in net present value and is not computed; chapter 17, the addition to the
|
||||
direction, is coded all the way: solution T through the build-out, the power system, the cash flow, the
|
||||
levelised cost, ownership, scale, M5 and the verdicts, and S48–S54).
|
||||
`modell/parametere.json`: the frozen
|
||||
|
|
@ -201,7 +205,7 @@ carousel, Python code, and a Claude plugin (own repo, later).
|
|||
(17.8) were frozen in the deviation of 2026-11-12 and stand last in the parameter file.
|
||||
- **Known-answer tests:** nothing is tuned to make one pass. A miss stays in the suite as a strict `xfail` with
|
||||
the measured deviation and the cause if known, and is reported in the review log.
|
||||
- **Part 6 has begun (2026-11-14):** the main run on the frozen numbers was started from a separate copy of
|
||||
- **Part 6 is done (the main run, 2026-11-14):** the main run on the frozen numbers was started from a separate copy of
|
||||
the code (`private/kjoring-del6/kode`, a git worktree on the commit the run is made from; never edit it while
|
||||
a run goes: the worker processes read the code from disk). It writes to `data/resultater/`. Clarification 140
|
||||
fixes how: one command writes the five files one at a time, `dommer.json` first; a seventh and an eighth
|
||||
|
|
@ -220,11 +224,21 @@ carousel, Python code, and a Claude plugin (own repo, later).
|
|||
run's verdicts («normalisering», the step the verdicts are read on), M7 without a verdict and the main
|
||||
known limitations, every measured number with `\tall{key}`. Chapter 7 builds on area 27 of the source bank
|
||||
and names no company; chapter 9 renders chapters 13 and 17.9 of the specification with the wording after
|
||||
the change of the hypothesis. Chapter 8 lists seven things the specification says shall be reported that
|
||||
are not computed (build-out with stopping, the two terms of S19, what households and businesses pay, the
|
||||
split of A against B′, spent fuel, the need for labour and capital, the table per price area), the seven
|
||||
known-answer misses, three notes on the frozen parameter file (review log part 29), and two observations from area 27 outside the frozen ranges in favour of nuclear
|
||||
power (review log part 25). Chapters 3 to 5 were read against the specification by independent readers
|
||||
the change of the hypothesis. Chapter 8 holds the two findings from the expert bodies that the frozen
|
||||
ranges do not cover (review log part 19); the observations in the other direction from area 27 (learning,
|
||||
where three estimates lie above the upper bound of the learning rate, and build time; review log part 25)
|
||||
and three costs below the range for a large reactor (Olkiluoto 3 and Saeul 1–2 from area 28, Barakah from
|
||||
K28-011 and K03-011), none of them computed in, set against the budget reading of the cost range and row 1; three
|
||||
notes on the frozen parameter file (review log part 29); seven things the specification says shall be
|
||||
reported that are not computed (build-out with stopping, the two terms of S19, what households and
|
||||
businesses pay, the split of A against B′, spent fuel, the need for labour and capital, the table per price
|
||||
area); the seven known-answer misses; and fourteen calculations the critics of round 9c and the readers of
|
||||
round 9d asked for that are not done, with their direction where it is known (among them interest during the
|
||||
data centre's construction, clarification 143). Chapters 6 and 8 explain the direction of the interest rate
|
||||
(S26 discounts from 2027, so a loss that lies years ahead shrinks with a higher rate): explained for rows 3, 4
|
||||
and 23 and surface (c), partly for rows 16 and 24; the split by term on the frozen numbers, row 24 on the frozen
|
||||
numbers and row 37 are said outright to be not explained. The checks behind it (the made-up basis term by term,
|
||||
the committed tools on the first 200 frozen draws) are in review log part 30, not in the result files. Chapters 3 to 5 were read against the specification by independent readers
|
||||
2026-11-14. Appendix B (the 137 parameters and the 37 lines of the sensitivity list) and the
|
||||
reference list are generated by `rapport/lag_vedlegg_parametere.py` and `lag_referanser.py` into
|
||||
`rapport/generert/` (run by `bygg.sh`, the reference list last; neither is edited by hand). Appendix C
|
||||
|
|
@ -235,13 +249,13 @@ carousel, Python code, and a Claude plugin (own repo, later).
|
|||
holds every entry cited with `\kilde{...}` or in the parameter file, and every entry the `Kilde` field of
|
||||
a listed entry points to, with the entry's title and `Kilde` field without the work notes (`ARBEIDSNOTATER`:
|
||||
local copies, tool names, who added it; a trace left stops the script); a cited entry without a confirmed `Kontroll` line stops the script. `\kilde` links each id to its
|
||||
item (ranges are written `K27-008 til K27-011`). `rapport/notat.tex` is the two-page summary and
|
||||
item (ranges are written `K27-008 til K27-011`). `rapport/notat.tex` is the two-page summary (set in 10 pt since 2026-11-23 to stay on two pages) and
|
||||
`rapport/kap10-konklusjon.tex` the conclusion chapter. They, `sammendrag.tex`, the opening of chapter 1 and
|
||||
`README.md` are written for a reader who does not know the project (the operator's requirement
|
||||
2026-11-14): the answer first, the few numbers that carry it, what could change it and what was learned,
|
||||
after the approved wording of `innspill/`; the equations and the argument of chapters 2 to 9 stay as they
|
||||
are. Every measured number in them is still a `\tall` key (in the README typed as the key renders it). The built PDFs are copied to `pdf/` (the report is
|
||||
marked «utkast»). The carousel (`rapport/karusell.tex`, 28 slides, xelatex; built 2026-11-22, copied to `pdf/Tokenfabrikker_karusell.pdf`) follows the text the operator approved that day, verbatim, with the nine corrections and the page count he approved 2026-11-23 after reading round 9a (review log part 28; `private/del9-rapporter/9a/`); every measured number in it is a `\tall` key, also in the figures, and `rapport/resultater/karusell.py` adds the keys that begin with `karusell.` and writes the figure geometry (dots, bars, staircase, timeline) to `rapport/generert/karusell-*.tex`. A change of wording on a slide needs the operator's yes. The PDFs
|
||||
marked «utkast»). The carousel (`rapport/karusell.tex`, 28 slides, xelatex; built 2026-11-22, copied to `pdf/Tokenfabrikker_karusell.pdf`) follows the text the operator approved that day, verbatim, with the nine corrections and the page count he approved 2026-11-23 after reading round 9a (review log part 28; `private/del9-rapporter/9a/`); every measured number in it is a `\tall` key, also in the figures, and `rapport/resultater/karusell.py` adds the keys that begin with `karusell.` and writes the figure geometry (dots, bars, staircase, timeline) to `rapport/generert/karusell-*.tex`. A change of wording on a slide needs the operator's yes: the working copy of `rapport/karusell.tex` holds the changes proposed after rounds 9c and 9d (review log part 30), a proposal until the operator says yes, and `pdf/` keeps the approved carousel. Critique round 9c, what stood open from 9a and 9b, and reading round 9d with six new readers are review log part 30. The PDFs
|
||||
are not tagged for universal design (review log part 26).
|
||||
- **Chapter 6 (the results) is generated from the result files.** `rapport/lag_resultater.py` runs the
|
||||
modules in `rapport/resultater/` (`dommer`, `tidslinje`, `miljo`, `eierformer`, `terskler`, `folsomheter`;
|
||||
|
|
|
|||
Loading…