6443c4f151
docs(rapport): corrections after the fresh-reader test (round 9d)
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.

- grid-connected nuclear now stands next to the dedicated plant where
  the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
  (new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
  "not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
  the state's rate, requirements that hold by construction, the two
  build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt

The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:29:08 +01:00
fe83f9f194
docs(rapport): close the gaps from critique round 9c
Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.

- Summary, two-page summary, chapters 1 and 10, README: what the test did
  and did not try, what the 1.1 % share rests on, the interest rate, the
  build pace, and the lesson on a dedicated nuclear plant as what the
  comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
  probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
  are not made, what "independent" means in the project, that the
  pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
  parameter): long leases, the largest compute deals, recent reactor
  costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.

Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 15:58:13 +01:00
4defd09580
docs(rapport): chapter 6, the results, generated from the eight result files, with ten figures
Every measured number in the prose and the tables is read from data/resultater/ by
rapport/lag_resultater.py (modules in rapport/resultater/) and carries file, path and raw
value in rapport/generert/tall.json. Chapter 8 says what is missing: the ranking of the
ownership forms under other weightings and limits is not computed, and the reproduction
is on one machine.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>