Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.
- grid-connected nuclear now stands next to the dedicated plant where
the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
(new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
"not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
the state's rate, requirements that hold by construction, the two
build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt
The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Appendix B, appendix C and the reference list are generated from the frozen
parameter file, the pre-registration and the source bank. Citations link to
their item in the list. The two-page summary states only what the summary in
the report states. Draft PDFs of the report and the summary are in pdf/.