docs(kilder): record the project's own check of 30 entries behind chapter 17
The 30 entries chapter 17 of the specification cites that the project had not
looked up itself are now checked against the primary source: 23 in the files
the researchers and controllers downloaded, 2 in pages fetched now, 1 through
a search tool, and 4 in Statnett's register of grid connection cases, read in
the browser filter by filter. Each entry says what was looked up and what was
not. K26-006 also records which scenario its rows belong to.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 23:07:08 +01:00
27dcd8790a
docs(kilder): add areas 22-26 for the addition to the direction
Third round of source work, before anything is computed: what can be in
operation within a few years on the existing grid (22), power sources with
short lead time (23), stepwise build-up and switching power solution over
time (24), AI compute on users' own machines (25), and the two quantities
the model lacked parameters for: avoided emissions and cooling water (26).

188 entries, one researcher and one independent verifier per area:
114 confirmed, 52 corrected, 22 added by the verifiers, none unconfirmed.
22 load-bearing entries were checked a third time against the primary
source and carry an "Egenkontroll" line.

The model, the frozen parameters and the pre-registration are unchanged.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>