cc0c306bac
docs(modell): write the addition to the direction into the specification and the pre-registration
Chapter 17 of the specification (S48-S54): solution T, "stepwise", in two
versions (T-F and T-K), the timeline, a threshold and two labelled scenarios
for compute on the users' own machines, emissions with a deduction, and
cooling water. The pre-registration gets T-F and T-K in the table of
alternatives, in M7 and in clarifications 1, 3, 10 and 11, new clarifications
13-16 and a dated entry. An independent reader coded the chapter from the text
alone in three rounds; the findings and what was done are in part 8 of the
review log.

Nothing is computed. The parameter file is unchanged (checksum 4582835...f6cc);
the new quantities are candidates until the deviation from the freeze. The
eight choices in 17.7 are put to the project owner and not yet approved.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 22:39:36 +01:00
a705842f88
docs: describe the settled code for chapters 7 to 11
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 14:33:50 +01:00
326b80d8d1
docs: describe the build-out, the cash flow and the event stream
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 11:58:25 +01:00
aee22b9101
docs: describe the code, the commands and the new conventions
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 10:08:48 +01:00
9e3feb367e
docs(modell): add specification draft 3 and review log
Draft 3 has 47 equations. Changes follow the pre-read of draft 2
(44 findings), two independent reviews of draft 3 (55 and 22 findings)
and an independent control of the corrections (39 findings). Each
finding was checked by the project before it was corrected; the log
says what was done with each.

Main changes: all parameters in 2025 kroner; explicit cash flows per
solution; the price of compute set per MW sold, so that unsold capacity
is not charged to Norway alone; power plants on the grid are never
credited a surplus (S45); the reading of the Norwegian nuclear cost
range is drawn (S46); dimensioning, build-out and residual value are
specified. Eight proposed clarifications of the pre-registration are
listed in chapter 15 and are not entered there.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 00:57:41 +01:00
5a4d9b0072
docs(modell): add model specification draft 2 and review log
Draft 1 was read by two independent reviewers (a subject reviewer and a
devil's advocate). Draft 2 corrects the equations they found wrong
(levelised price, token cost unit, welfare sign, double counting) and
models off-grid operation with unit size limits and reserve units.
Findings that touch the pre-registered criteria are listed as open
decisions, not applied.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 22:20:04 +01:00
5f60c681ed
feat: initial commit with pre-registration and source bank
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 21:55:45 +01:00