feat(report): four-page summary with the additional analyses, and the page
The summary for decision makers gets a section on the four analyses made
after the results (24 numbers, all tillegg. keys), the sentence on what
grid-connected nuclear power is in the model, and the fuller wording of the
simplifications. 11 pt and the report's margins: four pages. The results
page names the four analyses in one passage with no new numbers. Slide 27
of the carousel and the README say four pages. The report is unchanged.

Every changed word was approved by the owner 2026-11-24 before the build.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 20:13:15 +01:00
502cdaa550
docs(rapport): corrections after the second fresh-reader test (round 9e)
Four new readers, each with a controller, read the corrected PDFs, the
carousel, the post and the text of the results page. No measured number was
wrong. The summaries, chapters 6, 8 and 10 and the results page now say that
twelve years from decision to grid applies to the Emirates only, that a full
yes was in practice out of reach, that the first-year cash flow is a year
without chip purchases, where the cost range for nuclear power comes from and
what the committee behind it concluded, that the study behind the dedicated
plant found the grid as backup cheaper, and what the cooling water and
emission columns on the results page are. The source bank counts 1,237
entries. PDFs rebuilt (171 and 2 pages); the results page rebuilt (7,213
numbers). The carousel is not part of this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 19:33:19 +01:00
6443c4f151
docs(rapport): corrections after the fresh-reader test (round 9d)
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.

- grid-connected nuclear now stands next to the dedicated plant where
  the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
  (new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
  "not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
  the state's rate, requirements that hold by construction, the two
  build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt

The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:29:08 +01:00
a8e82c66b2
feat(nettside): version 2 of the results page after the independent review
Opens with the answer and the distribution as dots, then scale against
petroleum, the ladder of programme sizes with the share that cannot be
built, an animated timeline, a scroll story over the scenarios, the 3D
landscape with depth and lighting, and the explorer. States outright that
the scale target is «holder under betingelser» when scarcity lasts.
Plain language throughout, number provenance on click and keyboard,
touch targets of 44 px, one number format.

Checked by the session with its own code: 7 200 numbers against the
result files, 749 control states, no network requests.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-22 16:11:24 +01:00
8e60454a6b
feat(nettside): interactive results page with 3D threshold surfaces
One self-contained HTML page built by nettside/lag_nettside.py from the
result files of the main run, with the report's number format. The
controls choose among computed results only (scenario, step, solution,
the 42 sensitivity rows, the classes of the threshold surfaces); nothing
is recomputed in the browser. Every shown number carries its file, path
and raw value in an embedded manifest; all 6,909 were re-read from the
result files with independent code without a mismatch.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>