Section 8.4 of chapter 8 holds the four analyses made after the results
(expected net present value, half the construction time for small units
with the free choice of unit size, no displacement in the grid queue, net
present value by term), outside the verdicts, each with its reservation
and a list of what is not checked. Every number is a tillegg. key from
the new module rapport/resultater/tillegg.py, which reads data/tillegg/
and stops the build if the files do not agree with the main run's.
Section 8.3 now lists ten calculations not done, the row in appendix C
says the analyses are done, one sentence in chapter 10 and one in each of
three files of chapter 6 point to the section, and the README names the
analyses and the commands that made them. The report is 177 pages and is
copied to pdf/. The operator approved the wording 2026-11-24.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written and committed before any of them is coded or computed, as the
project owner approved 2026-11-23. Clarification 144 holds the frame: what
an additional analysis is, the rule for the order, that everything started
is reported, what was known beforehand, and all fifteen with a decision.
145 to 148 fix the four that are done now on the frozen numbers (expected
net present value, half the construction time for small units with the
free choice of unit size, no displacement in the grid queue, net present
value by term), and 149 how they are run, checked and stored in
data/tillegg/. Row in appendix C, dated entry in the pre-registration,
report rebuilt (172 pages).
No verdict, threshold, parameter, draw or result file changes.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.
- grid-connected nuclear now stands next to the dedicated plant where
the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
(new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
"not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
the state's rate, requirements that hold by construction, the two
build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt
The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.
- Summary, two-page summary, chapters 1 and 10, README: what the test did
and did not try, what the 1.1 % share rests on, the interest rate, the
build pace, and the lesson on a dedicated nuclear plant as what the
comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
are not made, what "independent" means in the project, that the
pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
parameter): long leases, the largest compute deals, recent reactor
costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.
Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The verbatim list of changes was the project's working log. The appendix now
shows what was changed, when, before or after the results, and the effect on
the test as each entry states it, and points to the full list in the
pre-registration. The generator for the verbatim list is removed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>