Ten slides have new wording after the second fresh-reader test (review log
part 31), and slides 26 and 27 say 1,237 source entries. Every change is
listed in the session's table for the project owner, who approved them.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.
- grid-connected nuclear now stands next to the dedicated plant where
the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
(new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
"not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
the state's rate, requirements that hold by construction, the two
build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt
The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Chapter 4 no longer says the amount of spent fuel is reported. Chapter 6.5
says which way the median goes with the required return, with the part that
follows from the equations and the part that is not explained. Chapter 8 lists
seven things that are not computed, the known-answer misses and three notes on
the frozen parameter file, which is unchanged. Chapter 7 separates measured
learning rates from estimates. The reference list leaves out work notes and
lists the entries another entry points to. README and tool configuration say
Python 3.12. The report is 158 pages; slide 27 follows.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The slides follow the text the operator approved 2026-11-22, verbatim. Every
measured number is a \tall key, also in the figures. The new module
rapport/resultater/karusell.py adds 41 derived keys (all beginning with
karusell.) and writes the figure geometry to rapport/generert/. The 6 886
existing keys are unchanged, and the report and the summary build as before.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
A derived number per solution and scenario, (k - 1) * 100, replaces
'1,068 times as high' with '7 % above' where a reader meets it first.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Every measured number in the prose and the tables is read from data/resultater/ by
rapport/lag_resultater.py (modules in rapport/resultater/) and carries file, path and raw
value in rapport/generert/tall.json. Chapter 8 says what is missing: the ranking of the
ownership forms under other weightings and limits is not computed, and the reproduction
is on one machine.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>