Draft 3 has 47 equations. Changes follow the pre-read of draft 2
(44 findings), two independent reviews of draft 3 (55 and 22 findings)
and an independent control of the corrections (39 findings). Each
finding was checked by the project before it was corrected; the log
says what was done with each.
Main changes: all parameters in 2025 kroner; explicit cash flows per
solution; the price of compute set per MW sold, so that unsold capacity
is not charged to Norway alone; power plants on the grid are never
credited a surplus (S45); the reading of the Norwegian nuclear cost
range is drawn (S46); dimensioning, build-out and residual value are
specified. Eight proposed clarifications of the pre-registration are
listed in chapter 15 and are not entered there.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Draft 1 was read by two independent reviewers (a subject reviewer and a
devil's advocate). Draft 2 corrects the equations they found wrong
(levelised price, token cost unit, welfare sign, double counting) and
models off-grid operation with unit size limits and reserve units.
Findings that touch the pre-registered criteria are listed as open
decisions, not applied.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>