Commit graph

4 commits

Author SHA1 Message Date
fe83f9f194
docs(rapport): close the gaps from critique round 9c
Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.

- Summary, two-page summary, chapters 1 and 10, README: what the test did
  and did not try, what the 1.1 % share rests on, the interest rate, the
  build pace, and the lesson on a dedicated nuclear plant as what the
  comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
  probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
  are not made, what "independent" means in the project, that the
  pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
  parameter): long leases, the largest compute deals, recent reactor
  costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.

Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 15:58:13 +01:00
75bf83a6e5
docs(kilder): record primary-source figures read during the review
Five entries get the figures the project itself read in the primary
source and that parameters now rest on: the remaining rows of table
5.17 in the consultant report (K16-002), the assumptions sheet of the
commission's spreadsheet (K16-012), all twelve power balances in NVE's
2035 scenarios (K21-087), the intermediate years of the carbon price
sensitivity paths (K09-014) and table 6-1 of the Argonne study (K12-001).

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 00:35:19 +01:00
94c65da1c7
docs(kilder): add targeted source work for the open parameters
Second round of the source bank, before the parameter freeze: eight
tracks for the open points 10-17 in the specification (areas 13-20),
the three unconfirmed entries in area 11 and the outdated entries
(area 21). One researcher and one independent verifier per track.

286 new entries (157 confirmed, 93 corrected, 36 added by verifiers,
1 not confirmed). 57 verified corrections applied to existing entries,
each with the previous wording kept in the control line. 53 entries
checked by the project itself against the primary source (Egenkontroll).
README and the cross-area review updated.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 23:53:52 +01:00
5f60c681ed
feat: initial commit with pre-registration and source bank
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 21:55:45 +01:00