Draft 3 has 47 equations. Changes follow the pre-read of draft 2 (44 findings), two independent reviews of draft 3 (55 and 22 findings) and an independent control of the corrections (39 findings). Each finding was checked by the project before it was corrected; the log says what was done with each. Main changes: all parameters in 2025 kroner; explicit cash flows per solution; the price of compute set per MW sold, so that unsold capacity is not charged to Norway alone; power plants on the grid are never credited a surplus (S45); the reading of the Norwegian nuclear cost range is drawn (S46); dimensioning, build-out and residual value are specified. Eight proposed clarifications of the pre-registration are listed in chapter 15 and are not entered there. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| fagfellevurdering-utkast-1.md | ||
| fagfellevurdering-utkast-2-og-3.md | ||
| spesifikasjon.md | ||