Clarifications 82 to 87 in chapter 16: the power cost per module (S11), the factor of S51 in
S19, S27, S31 and S42, what the level of S42 means with modules, scale and the business
economics for T, and one known property the independent reader found: the nuclear plant's own
grid connection is not in the business economics, which favours B, B' and T-K there. It is
put to the project owner and not changed. Clarification 77 said every cost is the same with
and without a loss of demand; the capacity cost is the exception, and the text now says so.
Part 12 of the review log: the reconciliation against the reader's code (1 760 made-up paths,
6.6 million figures, no difference), the reader's findings and what was done, and the faults
found in the project's own code. No figure in the parameter file is changed, and no result
has been computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>