Clarifications 70 to 75 in chapter 16: nuclear power before new grid is
refused, the grid balance in years with an export stop, the payment
condition for a module's power plants, two sensitivities of 17.8, the
paths for the loss of demand and for u_alt, and the timeline (S50).
None of them changes a number for values within the ranges of the
parameter file. The parameter file and the pre-registration are unchanged.
Part 10 of the review log: the project's code for the build-out of T-F
and T-K and for S48-S54 against the independent reader's code, on
made-up sets only: 42 000 build-outs and 20 000 sets for S51-S54
without a difference. Nothing is computed for the hypothesis.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>