ktg-plugin-marketplace/plugins/config-audit/docs/v5-implementation-log.md
Kjell Tore Guttormsen 4bd7cd5056 docs(config-audit): v5.0.0 brief + implementation plan
Planning artifacts for v5.0.0 (token-economy round):

- v5-brief.md: scope brief with 22 items (F1-F7 + M1-M8 + N1-N7), revised
  with Avklaringer-section after critical review (N7 dropped, M3+N6 merged,
  N5 promoted to v5.0.0, SC-6/SC-10 reformulated)
- v5-plan.md: 31-step implementation plan in 5 sessions
  (alpha.1 → alpha.2 → beta.1 → rc.1 → release). B+ score (84/100) after
  plan-critic + scope-guardian review addressed all blockers/majors/gaps.
- v5-implementation-log.md: per-session status record (skeleton)

Sessions track via state files (REMEMBER.md, TODO.md gitignored;
implementation-log.md committed; NEXT-SESSION-PROMPT.local.md gitignored).

No code changes in this commit — planning only.
2026-05-01 06:10:44 +02:00

2.4 KiB

config-audit v5.0.0 — Implementation Log

Per-session record of what was done, what was deferred, and what failed. Written at the end of each session. State for the next session lives in NEXT-SESSION-PROMPT.local.md (gitignored).


Planning session (2026-05-01)

Outcome: Plan ready for execution.

Completed:

  • Read v5-brief.md (drafted 2026-04-19)
  • Brief reviewer ran — 5 findings requiring user input
  • User decisions captured:
    • N7 (cache-hit-digest) dropped from v5.0.0 — moved to post-release
    • N5 (live tokenizer) moved into v5.0.0 with warn-and-fallback
    • M3 merged into N6 (single collision scanner)
    • M1 manifest-fallback approach approved (cache → package.json → "tool count unknown" finding)
    • SC-6 split to 6a/6b
    • SC-10 replaced with per-feature coverage requirement
    • N1 backward-compat for CA-TOK-* glob suppression flagged in CHANGELOG
  • Brief revised with "Avklaringer fra konsultasjon 2026-05-01" section (authoritative)
  • Exploration: 7 parallel agents (architecture, task-finder, dependency-tracer, risk-assessor, test-strategist, git-historian, convention-scanner)
  • Plan written: docs/v5-plan.md — 31 steps in 5 sessions
  • Adversarial review: plan-critic verdict REPLAN (Grade C, 5 blockers + 8 majors); scope-guardian MIXED (4 gaps)
  • Plan revised to address all 5 blockers + 8 majors + 4 scope-gaps; new score B+ (84/100)

Open assumptions (carry into execution):

  1. Anthropic count_tokens endpoint accepts plain-text payload, returns {input_tokens: number} (Step 26)
  2. MCP servers expose tool count via tools/list or package.json tools field (Steps 14, 18)
  3. readActiveConfig performant enough for TOK at scale (Step 6)
  4. Cross-plugin namespace model — to be verified by Step 22a research spike before Step 22b
  5. baseline-all-a fixture is genuinely info-only after F3 — Step 3 audit verifies

Next session: Session 1 — alpha.1 (F1-F5 + reference cleanup). See NEXT-SESSION-PROMPT.local.md.


Session 1 — alpha.1 (TBD)

Start when ready. Replace this stub with actual log at session end.

Steps planned: 1-9 (incl. 8b)

Branch strategy: direct-to-main (Forgejo, pre-authorized).


Session 2 — alpha.2 (TBD)

Steps 10-17.


Session 3 — beta.1 (TBD)

Steps 18, 19, 20, 21, 22a, 22b, 23.


Session 4 — rc.1 (TBD)

Steps 24-27.


Session 5 — release (TBD)

Steps 28-30, including SC-6b release gate.