fix(playground): align the demo project description with its reports
The demo project card now describes the system the 17 demo reports are about: a citizen chatbot that pre-assesses applications for municipal housing allowance (bostøtte) from uploaded attachments. It previously described a building-permit (byggesak) chatbot that no report mentions. Six fixtures (classify, requirements, conformity, review, adr, summary) are set equal to the corrected text already inlined in the demo block: the Annex III deadline 2027-12-02 and the 2026-08-02 transparency label, instead of 2027-08-02. Chose syncing the fixtures to the block over editing the block by hand, because the block is build output and a rebuild from the old fixtures would have put the wrong deadlines back in the demo. Rebuilt the demo state and regenerated the 24 screenshots once with tests/screenshot/run.mjs; MANIFEST.json matches the new demo state. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
d670e7b3ee
commit
2e9bc5e0bb
26 changed files with 27 additions and 27 deletions
|
|
@ -43,7 +43,7 @@ Beslutning evalueres etter 12 måneder mot KPI-er:
|
|||
- Saksbehandlingstid (mål: -40%)
|
||||
- Modell-nøyaktighet (mål: ≥96% F1)
|
||||
- Total cost (mål: ≤ NOK 1.7M/år)
|
||||
- Compliance-status (mål: 100% av krav dekket innen 2027-08-02)
|
||||
- Compliance-status (mål: 100% av krav dekket innen 2027-12-02)
|
||||
|
||||
## More Information
|
||||
|
||||
|
|
|
|||
|
|
@ -30,4 +30,4 @@ Reasoning: Systemet brukes av offentlig myndighet til å vurdere om innbyggere h
|
|||
|
||||
## Frist
|
||||
|
||||
Full compliance innen 2027-08-02 (Annex III høyrisiko full compliance).
|
||||
Full compliance innen 2027-12-02 (Annex III høyrisiko full compliance, utsatt fra 2026-08-02).
|
||||
|
|
|
|||
|
|
@ -24,10 +24,10 @@ Vurderingsprosedyre: Annex VI (intern kontroll)
|
|||
|
||||
| Dato | Milepæl | Status |
|
||||
|------|---------|--------|
|
||||
| 2026-08-02 | GPAI-krav + Annex III høyrisiko | upcoming |
|
||||
| 2026-08-02 | Transparens (Art. 50) | upcoming |
|
||||
| 2026-09-01 | Transparens-instruksjoner ferdigstilt | upcoming |
|
||||
| 2027-02-01 | FRIA og DPIA-revisjon | upcoming |
|
||||
| 2027-08-02 | Full Annex III høyrisiko-compliance | upcoming |
|
||||
| 2027-12-02 | Full Annex III høyrisiko-compliance (utsatt fra 2026-08-02) | upcoming |
|
||||
|
||||
## Konklusjon
|
||||
|
||||
|
|
|
|||
|
|
@ -28,4 +28,4 @@ Klassifisering: høy risiko, rolle Provider+Deployer
|
|||
- 4 krav er delvis møtt (partial)
|
||||
- 6 krav mangler implementering (missing)
|
||||
|
||||
Prioritering: FRIA og transparens-instruksjoner må adresseres før idriftsettelse 2027-08-02.
|
||||
Prioritering: FRIA og transparens-instruksjoner må adresseres før idriftsettelse 2027-12-02.
|
||||
|
|
|
|||
|
|
@ -27,4 +27,4 @@ Low (2): Dokumentasjon, testing — opportunity-quality.
|
|||
|
||||
## Anbefaling
|
||||
|
||||
Idriftsettelse anbefales IKKE før F-01 er løst. F-02 til F-04 må adresseres innen 2026-09-01 for å holde 2027-08-02-fristen.
|
||||
Idriftsettelse anbefales IKKE før F-01 er løst. F-02 til F-04 må adresseres innen 2026-09-01 for å holde 2027-12-02-fristen.
|
||||
|
|
|
|||
|
|
@ -18,7 +18,7 @@ Arkitekturen er teknisk solid og økonomisk forsvarlig (P50 NOK 1.7M/år), men c
|
|||
|
||||
| Metric | Verdi | Mål |
|
||||
|--------|-------|-----|
|
||||
| Compliance-dekning | 33% (4/12 fullt møtt) | 100% innen 2027-08-02 |
|
||||
| Compliance-dekning | 33% (4/12 fullt møtt) | 100% innen 2027-12-02 |
|
||||
| Sikkerhetsscore | 22/30 (73%) | ≥27/30 (90%) |
|
||||
| TCO 3 år | NOK 6.7M | ≤ NOK 7M |
|
||||
| Saksbehandlingstid (pilot) | -32% (estimert) | -40% |
|
||||
|
|
|
|||