docs(rapport): corrections after the fresh-reader test (round 9d)
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.

- grid-connected nuclear now stands next to the dedicated plant where
  the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
  (new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
  "not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
  the state's rate, requirements that hold by construction, the two
  build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt

The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:29:08 +01:00
63acecf584
docs(rapport): corrections after reading round 9b, PDFs rebuilt
Chapter 4 no longer says the amount of spent fuel is reported. Chapter 6.5
says which way the median goes with the required return, with the part that
follows from the equations and the part that is not explained. Chapter 8 lists
seven things that are not computed, the known-answer misses and three notes on
the frozen parameter file, which is unchanged. Chapter 7 separates measured
learning rates from estimates. The reference list leaves out work notes and
lists the entries another entry points to. README and tool configuration say
Python 3.12. The report is 158 pages; slide 27 follows.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 10:31:39 +01:00
078f6d9f9c
docs(rapport): appendix C as a one-page table of the changes to the pre-registration
The verbatim list of changes was the project's working log. The appendix now
shows what was changed, when, before or after the results, and the effect on
the test as each entry states it, and points to the full list in the
pre-registration. The generator for the verbatim list is removed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 22:08:04 +01:00
f271f11715
docs(rapport): appendices with the parameters and the change list, the reference list, and the two-page summary
Appendix B, appendix C and the reference list are generated from the frozen
parameter file, the pre-registration and the source bank. Citations link to
their item in the list. The two-page summary states only what the summary in
the report states. Draft PDFs of the report and the summary are in pdf/.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 21:24:36 +01:00
339161df18
docs(rapport): LaTeX skeleton of the report, the summary and the carousel, with placeholders for every result
Foreword, chapters 1, 2 and 8 and the appendix from equation to code are
written from the pre-registration, the review log and the map; the rest are
stubs. bygg.sh builds with a time limit per LaTeX run. Not yet read against
the sources by the session.