Commit graph

6 commits

Author SHA1 Message Date
326b80d8d1
docs: describe the build-out, the cash flow and the event stream
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 11:58:25 +01:00
aee22b9101
docs: describe the code, the commands and the new conventions
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 10:08:48 +01:00
28eaa80f09
docs(forhandsregistrering): enter the eight approved clarifications
The project owner approved the eight proposed clarifications of the
pre-registered criteria on 2026-11-12, as recommended, after the
parameter freeze and before any code or result exists. They are entered
under «Presiseringer» with a dated entry and the reason for each under
«Endringer». Three wordings in the criteria text are aligned with them.

The specification now refers to them as clarifications instead of
proposals, and the rule for conditions uses the 10th to 90th percentile.
Equations and parameters are unchanged; modell/parametere.json keeps its
checksum.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 09:07:33 +01:00
9e3feb367e
docs(modell): add specification draft 3 and review log
Draft 3 has 47 equations. Changes follow the pre-read of draft 2
(44 findings), two independent reviews of draft 3 (55 and 22 findings)
and an independent control of the corrections (39 findings). Each
finding was checked by the project before it was corrected; the log
says what was done with each.

Main changes: all parameters in 2025 kroner; explicit cash flows per
solution; the price of compute set per MW sold, so that unsold capacity
is not charged to Norway alone; power plants on the grid are never
credited a surplus (S45); the reading of the Norwegian nuclear cost
range is drawn (S46); dimensioning, build-out and residual value are
specified. Eight proposed clarifications of the pre-registration are
listed in chapter 15 and are not entered there.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 00:57:41 +01:00
5a4d9b0072
docs(modell): add model specification draft 2 and review log
Draft 1 was read by two independent reviewers (a subject reviewer and a
devil's advocate). Draft 2 corrects the equations they found wrong
(levelised price, token cost unit, welfare sign, double counting) and
models off-grid operation with unit size limits and reserve units.
Findings that touch the pre-registered criteria are listed as open
decisions, not applied.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 22:20:04 +01:00
5f60c681ed
feat: initial commit with pre-registration and source bank
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 21:55:45 +01:00