The count 99 to 3 in the last paragraph of chapter 10 was cited to K29-007,
the budget proposition, which gives the decision but no vote count. The
citation is now K29-007 and K29-011 (the minutes of 2026-04-23). No word of
the text changed; the report is still 179 pages. PDF rebuilt.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Chapter 10 ends with the paragraph «Det regnestykket ikke svarer på»: the
answer is not an answer to whether Norway should have compute of its own
for preparedness and control. That value is not priced; what the model
offers is a price tag (the loss per facility, with the mean, the state's
discount rate and the lasting-scarcity scenario beside it). One sentence
in chapter 9 points there. Every measured number is an existing \tall key.
The source bank has area 29 (12 entries, 1 249 in all): the announced
white paper on digital sovereignty, the Storting's requests, the budget
proposition for 2027 and the votes of spring 2026. Each entry was written
by a reader and checked by a controller with a fresh fetch. Made after
the results; it feeds no parameter. kilder/README.md also said 10 entries
for area 28; it has 11.
The count of source entries is corrected in the two-page summary and on
slides 26 and 27 of the carousel, and slide 27 gives the report's 179
pages. The three PDFs are rebuilt and copied to pdf/. The operator
approved the wording and the numbers on the two slides 2026-11-24.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Section 8.4 of chapter 8 holds the four analyses made after the results
(expected net present value, half the construction time for small units
with the free choice of unit size, no displacement in the grid queue, net
present value by term), outside the verdicts, each with its reservation
and a list of what is not checked. Every number is a tillegg. key from
the new module rapport/resultater/tillegg.py, which reads data/tillegg/
and stops the build if the files do not agree with the main run's.
Section 8.3 now lists ten calculations not done, the row in appendix C
says the analyses are done, one sentence in chapter 10 and one in each of
three files of chapter 6 point to the section, and the README names the
analyses and the commands that made them. The report is 177 pages and is
copied to pdf/. The operator approved the wording 2026-11-24.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written and committed before any of them is coded or computed, as the
project owner approved 2026-11-23. Clarification 144 holds the frame: what
an additional analysis is, the rule for the order, that everything started
is reported, what was known beforehand, and all fifteen with a decision.
145 to 148 fix the four that are done now on the frozen numbers (expected
net present value, half the construction time for small units with the
free choice of unit size, no displacement in the grid queue, net present
value by term), and 149 how they are run, checked and stored in
data/tillegg/. Row in appendix C, dated entry in the pre-registration,
report rebuilt (172 pages).
No verdict, threshold, parameter, draw or result file changes.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Four new readers, each with a controller, read the corrected PDFs, the
carousel, the post and the text of the results page. No measured number was
wrong. The summaries, chapters 6, 8 and 10 and the results page now say that
twelve years from decision to grid applies to the Emirates only, that a full
yes was in practice out of reach, that the first-year cash flow is a year
without chip purchases, where the cost range for nuclear power comes from and
what the committee behind it concluded, that the study behind the dedicated
plant found the grid as backup cheaper, and what the cooling water and
emission columns on the results page are. The source bank counts 1,237
entries. PDFs rebuilt (171 and 2 pages); the results page rebuilt (7,213
numbers). The carousel is not part of this commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.
- grid-connected nuclear now stands next to the dedicated plant where
the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
(new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
"not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
the state's rate, requirements that hold by construction, the two
build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt
The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.
- Summary, two-page summary, chapters 1 and 10, README: what the test did
and did not try, what the 1.1 % share rests on, the interest rate, the
build pace, and the lesson on a dedicated nuclear plant as what the
comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
are not made, what "independent" means in the project, that the
pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
parameter): long leases, the largest compute deals, recent reactor
costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.
Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Chapter 4 no longer says the amount of spent fuel is reported. Chapter 6.5
says which way the median goes with the required return, with the part that
follows from the equations and the part that is not explained. Chapter 8 lists
seven things that are not computed, the known-answer misses and three notes on
the frozen parameter file, which is unchanged. Chapter 7 separates measured
learning rates from estimates. The reference list leaves out work notes and
lists the entries another entry points to. README and tool configuration say
Python 3.12. The report is 158 pages; slide 27 follows.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Six independent readers with a controller each read the carousel, the
summaries, the README, the opening of chapter 1 and chapter 10. No
measured number was wrong. Corrected: the scale requirement on slide 6
(25 %, not 5 %), which requirements can fell a solution (slide 18),
that not every number has a source, that all source checks were made by
language models, and a caveat on the advice to build stepwise. The
report is 155 pages.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
A derived number per solution and scenario, (k - 1) * 100, replaces
'1,068 times as high' with '7 % above' where a reader meets it first.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The verbatim list of changes was the project's working log. The appendix now
shows what was changed, when, before or after the results, and the effect on
the test as each entry states it, and points to the full list in the
pre-registration. The generator for the verbatim list is removed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The two-page summary and the summary in the report now open with the answer,
the numbers that carry it, what could change it and what was learned, after
the approved wording of the submission. New chapter 10 gives the conclusion,
chapter 1 opens with what is asked and why, and the README states the result.
Every measured number is still read from the result files.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Appendix B, appendix C and the reference list are generated from the frozen
parameter file, the pre-registration and the source bank. Citations link to
their item in the list. The two-page summary states only what the summary in
the report states. Draft PDFs of the report and the summary are in pdf/.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>