Chapters 7 to 11 of the specification, on the made-up set only:
- nivaaisert: the power cost per facility, year and vintage on levelised
form (S9, S11 with clarifications 2, 11, 13 and 15), S15, S19, S27, S42
- eierskap: the business cash flow with every asset booked, tax, S28, S29
and S30 for the four ownership forms, the criteria over the draws
- skala: S31 year by year, the first year with stable operation, M6
- miljo: S32 year by year, the rules of M5 (i) and (ii)
- dommer: S37, the verdict per target, the step of the ladder, the overall
verdicts; tested on invented outcomes
- kontantstrom: each asset is recorded as it is paid, and the price of
compute exposes the competitor's cost and the markup
This is an intermediate step. The readings are not settled: an independent
reader is coding the same from the specification alone, a first comparison
agrees on the levelised cost, S19, S42, the cash flows, M3 and M4 and
differs on depreciation at the final year, tax, debt and two definitions.
Chapter 16 gets the clarifications before any result is computed.
Nothing is computed for the hypothesis; the parameter file is unchanged.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The project owner approved the eight proposed clarifications of the
pre-registered criteria on 2026-11-12, as recommended, after the
parameter freeze and before any code or result exists. They are entered
under «Presiseringer» with a dated entry and the reason for each under
«Endringer». Three wordings in the criteria text are aligned with them.
The specification now refers to them as clarifications instead of
proposals, and the rule for conditions uses the 10th to 90th percentile.
Equations and parameters are unchanged; modell/parametere.json keeps its
checksum.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Draft 3 has 47 equations. Changes follow the pre-read of draft 2
(44 findings), two independent reviews of draft 3 (55 and 22 findings)
and an independent control of the corrections (39 findings). Each
finding was checked by the project before it was corrected; the log
says what was done with each.
Main changes: all parameters in 2025 kroner; explicit cash flows per
solution; the price of compute set per MW sold, so that unsold capacity
is not charged to Norway alone; power plants on the grid are never
credited a surplus (S45); the reading of the Norwegian nuclear cost
range is drawn (S46); dimensioning, build-out and residual value are
specified. Eight proposed clarifications of the pre-registration are
listed in chapter 15 and are not entered there.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Draft 1 was read by two independent reviewers (a subject reviewer and a
devil's advocate). Draft 2 corrects the equations they found wrong
(levelised price, token cost unit, welfare sign, double counting) and
models off-grid operation with unit size limits and reserve units.
Findings that touch the pre-registered criteria are listed as open
decisions, not applied.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>