Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.
- Summary, two-page summary, chapters 1 and 10, README: what the test did
and did not try, what the 1.1 % share rests on, the interest rate, the
build pace, and the lesson on a dedicated nuclear plant as what the
comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
are not made, what "independent" means in the project, that the
pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
parameter): long leases, the largest compute deals, recent reactor
costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.
Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Chapter 7 holds what the sources of area 27 say against the frozen distributions, theme by theme.
Chapter 9 renders the two lists of what the model does not do, with the wording after the change of
the hypothesis. The summary gives only the main run's verdicts, the comparison M7 without a verdict
and the main known limitations, every measured number read from the result files.
Four independent readers read chapters 3, 4 and 5 against the pre-registration, the specification,
the parameter file, the code and the source bank: 3 stoppers, 30 "should be corrected" and 52 "can
wait", all entered. The 54 equations are unchanged. The four remaining placeholders in chapters 4
and 5 are gone.
Chapter 8 now lists four things the specification says shall be reported that are not computed, and
two observations from area 27 that lie outside the frozen ranges in favour of nuclear power. The
sentence about n_0 is corrected after (S2). The explanation of row 21 in chapter 6 is corrected from
the figures in the file.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written by two helpers from the specification, the pre-registration and the
parameter file while the main run was going; no result is in them. The
equations are compared mechanically with the specification. Review log part 21
says what is checked and what is not, and the technical trial of tilleggsfiler
on 16 frozen draws.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Foreword, chapters 1, 2 and 8 and the appendix from equation to code are
written from the pre-registration, the review log and the map; the rest are
stubs. bygg.sh builds with a time limit per LaTeX run. Not yet read against
the sources by the session.