Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.
- Summary, two-page summary, chapters 1 and 10, README: what the test did
and did not try, what the 1.1 % share rests on, the interest rate, the
build pace, and the lesson on a dedicated nuclear plant as what the
comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
are not made, what "independent" means in the project, that the
pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
parameter): long leases, the largest compute deals, recent reactor
costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.
Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Six independent readers with a controller each read the carousel, the
summaries, the README, the opening of chapter 1 and chapter 10. No
measured number was wrong. Corrected: the scale requirement on slide 6
(25 %, not 5 %), which requirements can fell a solution (slide 18),
that not every number has a source, that all source checks were made by
language models, and a caveat on the advice to build stepwise. The
report is 155 pages.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
A derived number per solution and scenario, (k - 1) * 100, replaces
'1,068 times as high' with '7 % above' where a reader meets it first.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The two-page summary and the summary in the report now open with the answer,
the numbers that carry it, what could change it and what was learned, after
the approved wording of the submission. New chapter 10 gives the conclusion,
chapter 1 opens with what is asked and why, and the README states the result.
Every measured number is still read from the result files.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Chapter 7 holds what the sources of area 27 say against the frozen distributions, theme by theme.
Chapter 9 renders the two lists of what the model does not do, with the wording after the change of
the hypothesis. The summary gives only the main run's verdicts, the comparison M7 without a verdict
and the main known limitations, every measured number read from the result files.
Four independent readers read chapters 3, 4 and 5 against the pre-registration, the specification,
the parameter file, the code and the source bank: 3 stoppers, 30 "should be corrected" and 52 "can
wait", all entered. The 54 equations are unchanged. The four remaining placeholders in chapters 4
and 5 are gone.
Chapter 8 now lists four things the specification says shall be reported that are not computed, and
two observations from area 27 that lie outside the frozen ranges in favour of nuclear power. The
sentence about n_0 is corrected after (S2). The explanation of row 21 in chapter 6 is corrected from
the figures in the file.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>