The operator's four answers of 2026-11-12: clarifications 41-60 approved, clarifications 55-59 entered in the pre-registration as clarifications 9-12, the addition to the direction entered, and the announced deviation from the parameter freeze recorded. The result of the large comparison of part 5c is in part 6 of the review log. Clarifications 62-67 correct the weaknesses of clarification 61 in the comparison of ownership forms: residual value at the final year, the levies, the private owners, the rate the state's cash flow is valued with, and the cost of capital before tax. An independent reader coded them from the text in three rounds (20, 5 and 2 findings); part 7 of the review log. Clarification 68 holds the sources' figures for M5 (i), checked against the downloaded primary sources, and 69 the figures shown next to each verdict. The parameter file is unchanged. Nothing is computed for the hypothesis. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
5.4 KiB
5.4 KiB
Changelog
All notable changes to this project will be documented in this file.
Unreleased
- Pre-registration of what is tested and what it takes for the hypothesis to hold (
FORHANDSREGISTRERING.md). - Source bank: 948 entries in 21 areas, each checked against its primary source (
kilder/). The second round (areas 13–21) covers the parameters that lacked a source when the model was specified. - Model specification, draft 3 (47 equations), after a pre-read of draft 2, two independent reviews of draft 3
and a control of the corrections (
modell/). - Parameters frozen before anything is computed: 124 parameters in 2025 kroner, one distribution each, with the
source entries they rest on (
modell/parametere.json). The checksum is recorded in the pre-registration. No code and no results yet. - Eight clarifications of the pre-registered criteria, approved by the project owner after the parameter freeze
and before anything is computed (
FORHANDSREGISTRERING.md, «Presiseringer»). The parameter file is unchanged. - First code (
src/tokenfabrikker/): one function per equation for the power plant, the data centre and the revenue (S1–S21, S36, S43–S47), a strict reader for the frozen parameter file with unit conversion, and the 10 000 Monte Carlo draws stored indata/. Python with pinned numpy and scipy, pytest, ruffALLand mypy strict. No result for the hypothesis has been computed. - An independent reader coded the key equations from the specification alone. The two implementations agree on
all 23 functions. The 19 ambiguities the reader found are settled in a new, dated chapter 16 of the
specification (
modell/); the parameter file and the pre-registration are unchanged. - Known-answer tests against Argonne, NOU 2026: 4, Epoch and NVE with the sources' own assumptions
(
tests/test_fasit.py). The misses are kept as documented expected failures: wind on land and offshore wind come out 5–6 % below NVE, and three rows of Argonne's table depend on a reading the source does not settle. - Build-out, power system and cash flow in code (
src/tokenfabrikker/): when each facility starts and which vintages of IT hardware it gets (S22, S33), the export rule with its own stored stream of random numbers (data/aarshendelser.npy), the fitted price lines and the power and capacity balances (S23–S25, S38), and the yearly cash flows with residual value, the additionality rule and net present value for Norway (S26, S34, S35, S40, S45). Tested on made-up numbers only; no result for the hypothesis has been computed. - A second independent reader coded these equations from the specification alone and found 28 ambiguities. They
are settled in clarifications 21–40 in chapter 16 of the specification. With the readings aligned, the two
implementations agree on 10 000 made-up build-out paths. The clarifications that are choices are marked and put
to the project owner (
modell/fagfellevurdering-utkast-2-og-3.md, part 5). - The price lines of S38 are held against NVE's twelve scenarios: within 5 % for Norway and three price areas, 6.0 % and 7.7 % off in one scenario for NO3 and NO4, kept as documented expected failures.
- Business economics, ownership, scale, environment and verdicts in code (
nivaaisert.py,eierskap.py,skala.py,miljo.py,dommer.py; S15, S19, S27 to S32, S37, S42), tested on made-up numbers only. A third independent reader coded the same chapters from the specification alone and found 60 points, 14 of them objections to the economics; a new reader then recoded from the clarifications in four more rounds (17, 5, 1 and 0 new points). The readings stand in clarifications 41–61 in chapter 16; the two implementations agree on 1 000 made-up paths. Corrected after the readers: the accident cost stays when the additionality rule binds, tax depreciation loses real value with price growth, and the special tax only meets return above the cost of capital. Weaknesses in the comparison of ownership forms that are not corrected are listed in clarification 61 and put to the project owner (modell/fagfellevurdering-utkast-2-og-3.md, part 6). No result for the hypothesis has been computed. - The comparison of ownership forms corrected before anything is computed (clarifications 62–67 in chapter 16): a residual value at the final year as a taxable sale, the electricity tax as the state's only levy with what displaced private data centres would have paid deducted, private owners who pay what their share is worth in expectation, the state's cash flow valued with the required return for compute, and the cost of capital before tax. An independent reader coded the corrections from the text alone in three rounds; its first-round finding that the private owners and the state were priced with different rates changed the correction. With it every ownership form has the same expected value in the main run, and they differ in risk and capital. The two implementations agree to within one krone on 1 500 made-up paths. The corrections are choices put to the project owner.
- The direction of the project extended by the project owner (what can start quickly, a stepwise build-up, and
compute on the users' own machines), and four more clarifications of the pre-registered criteria (9–12), all
before anything is computed (
FORHANDSREGISTRERING.md). The sources' figures for the emissions test M5 (i) are set up and checked against the primary sources (clarification 68). The parameter file is unchanged.