# Changelog
|
||
|
||
All notable changes to this project will be documented in this file.
|
||
|
||
## Unreleased
|
||
|
||
- Pre-registration of what is tested and what it takes for the hypothesis to hold (`FORHANDSREGISTRERING.md`).
|
||
- Source bank: 948 entries in 21 areas, each checked against its primary source (`kilder/`). The second round
|
||
(areas 13–21) covers the parameters that lacked a source when the model was specified.
|
||
- Model specification, draft 3 (47 equations), after a pre-read of draft 2, two independent reviews of draft 3
|
||
and a control of the corrections (`modell/`).
|
||
- Parameters frozen before anything is computed: 124 parameters in 2025 kroner, one distribution each, with the
|
||
source entries they rest on (`modell/parametere.json`). The checksum is recorded in the pre-registration.
|
||
No code and no results yet.
|
||
- Eight clarifications of the pre-registered criteria, approved by the project owner after the parameter freeze
|
||
and before anything is computed (`FORHANDSREGISTRERING.md`, «Presiseringer»). The parameter file is unchanged.
|
||
- First code (`src/tokenfabrikker/`): one function per equation for the power plant, the data centre and the
|
||
revenue (S1–S21, S36, S43–S47), a strict reader for the frozen parameter file with unit conversion, and the
|
||
10 000 Monte Carlo draws stored in `data/`. Python with pinned numpy and scipy, pytest, ruff `ALL` and mypy strict.
|
||
No result for the hypothesis has been computed.
|
||
- An independent reader coded the key equations from the specification alone. The two implementations agree on
|
||
all 23 functions. The 19 ambiguities the reader found are settled in a new, dated chapter 16 of the
|
||
specification (`modell/`); the parameter file and the pre-registration are unchanged.
|
||
- Known-answer tests against Argonne, NOU 2026: 4, Epoch and NVE with the sources' own assumptions
|
||
(`tests/test_fasit.py`). The misses are kept as documented expected failures: wind on land and offshore wind
|
||
come out 5–6 % below NVE, and three rows of Argonne's table depend on a reading the source does not settle.
|
||
- Build-out, power system and cash flow in code (`src/tokenfabrikker/`): when each facility starts and which
|
||
vintages of IT hardware it gets (S22, S33), the export rule with its own stored stream of random numbers
|
||
(`data/aarshendelser.npy`), the fitted price lines and the power and capacity balances (S23–S25, S38), and the
|
||
yearly cash flows with residual value, the additionality rule and net present value for Norway (S26, S34, S35,
|
||
S40, S45). Tested on made-up numbers only; no result for the hypothesis has been computed.
|
||
- A second independent reader coded these equations from the specification alone and found 28 ambiguities. They
|
||
are settled in clarifications 21–40 in chapter 16 of the specification. With the readings aligned, the two
|
||
implementations agree on 10 000 made-up build-out paths. The clarifications that are choices are marked and put
|
||
to the project owner (`modell/fagfellevurdering-utkast-2-og-3.md`, part 5).
|
||
- The price lines of S38 are held against NVE's twelve scenarios: within 5 % for Norway and three price areas,
|
||