The operator approved the corrections to the comparison of ownership forms
on 2026-11-12, before anything is computed, and decided that the addition to
the direction is worked in before the run over the draws is coded.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The operator's four answers of 2026-11-12: clarifications 41-60 approved,
clarifications 55-59 entered in the pre-registration as clarifications 9-12,
the addition to the direction entered, and the announced deviation from the
parameter freeze recorded. The result of the large comparison of part 5c is
in part 6 of the review log.
Clarifications 62-67 correct the weaknesses of clarification 61 in the
comparison of ownership forms: residual value at the final year, the levies,
the private owners, the rate the state's cash flow is valued with, and the
cost of capital before tax. An independent reader coded them from the text in
three rounds (20, 5 and 2 findings); part 7 of the review log. Clarification
68 holds the sources' figures for M5 (i), checked against the downloaded
primary sources, and 69 the figures shown next to each verdict.
The parameter file is unchanged. Nothing is computed for the hypothesis.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The project owner approved the eight proposed clarifications of the
pre-registered criteria on 2026-11-12, as recommended, after the
parameter freeze and before any code or result exists. They are entered
under «Presiseringer» with a dated entry and the reason for each under
«Endringer». Three wordings in the criteria text are aligned with them.
The specification now refers to them as clarifications instead of
proposals, and the rule for conditions uses the 10th to 90th percentile.
Equations and parameters are unchanged; modell/parametere.json keeps its
checksum.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Commit 01b27fa, SHA-256 4582835…f6cc. The criteria are unchanged.
Eight proposed clarifications are with the project owner and are not
entered.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Approved by the project owner after two independent reviews of the
model specification, before anything is computed and before any code
exists: overall verdict, M2 against the price of compute, verdict per
price scenario with fixed build-out paths, the M4 requirement, M3 in
normal and dry years, the M6 numerator and year, a symmetric M7
threshold, a grid-purchase reference run, and the limit for state risk.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>