Commit graph

15 commits

Author SHA1 Message Date
54081343ec
fix(report): twelve small errors from the last reader test
Summary: the median changes little "with the five solutions"; the verdict
on profitability is read on the median and the share above zero; every
parameter has a source, is an open assumption or is a choice of set-up.
Report: the same sentence in chapter 1; in section 8.4 the reference points
to section 4.1, "svakt" is struck, and the eight data files are those of the
main run and the command after it. Carousel: slides 21, 25 and 26 (four
simplifications, short form), with tighter spacing on 21 and 26. README:
four simplifications. Page: the column is the average over the lifetime of
the IT equipment, and the dots lie near or below zero.

No measured number changes. Every changed word was approved by the owner
2026-11-24. 179, 4 and 28 pages.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 20:49:23 +01:00
7bf3d76e8e
feat(report): the four additional analyses in section 8.4
Section 8.4 of chapter 8 holds the four analyses made after the results
(expected net present value, half the construction time for small units
with the free choice of unit size, no displacement in the grid queue, net
present value by term), outside the verdicts, each with its reservation
and a list of what is not checked. Every number is a tillegg. key from
the new module rapport/resultater/tillegg.py, which reads data/tillegg/
and stops the build if the files do not agree with the main run's.

Section 8.3 now lists ten calculations not done, the row in appendix C
says the analyses are done, one sentence in chapter 10 and one in each of
three files of chapter 6 point to the section, and the README names the
analyses and the commands that made them. The report is 177 pages and is
copied to pdf/. The operator approved the wording 2026-11-24.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 12:16:26 +01:00
502cdaa550
docs(rapport): corrections after the second fresh-reader test (round 9e)
Four new readers, each with a controller, read the corrected PDFs, the
carousel, the post and the text of the results page. No measured number was
wrong. The summaries, chapters 6, 8 and 10 and the results page now say that
twelve years from decision to grid applies to the Emirates only, that a full
yes was in practice out of reach, that the first-year cash flow is a year
without chip purchases, where the cost range for nuclear power comes from and
what the committee behind it concluded, that the study behind the dedicated
plant found the grid as backup cheaper, and what the cooling water and
emission columns on the results page are. The source bank counts 1,237
entries. PDFs rebuilt (171 and 2 pages); the results page rebuilt (7,213
numbers). The carousel is not part of this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 19:33:19 +01:00
6443c4f151
docs(rapport): corrections after the fresh-reader test (round 9d)
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.

- grid-connected nuclear now stands next to the dedicated plant where
  the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
  (new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
  "not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
  the state's rate, requirements that hold by construction, the two
  build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt

The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:29:08 +01:00
fe83f9f194
docs(rapport): close the gaps from critique round 9c
Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.

- Summary, two-page summary, chapters 1 and 10, README: what the test did
  and did not try, what the 1.1 % share rests on, the interest rate, the
  build pace, and the lesson on a dedicated nuclear plant as what the
  comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
  probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
  are not made, what "independent" means in the project, that the
  pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
  parameter): long leases, the largest compute deals, recent reactor
  costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.

Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 15:58:13 +01:00
63acecf584
docs(rapport): corrections after reading round 9b, PDFs rebuilt
Chapter 4 no longer says the amount of spent fuel is reported. Chapter 6.5
says which way the median goes with the required return, with the part that
follows from the equations and the part that is not explained. Chapter 8 lists
seven things that are not computed, the known-answer misses and three notes on
the frozen parameter file, which is unchanged. Chapter 7 separates measured
learning rates from estimates. The reference list leaves out work notes and
lists the entries another entry points to. README and tool configuration say
Python 3.12. The report is 158 pages; slide 27 follows.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 10:31:39 +01:00
af3daaa6a9
docs(rapport): wording corrected after reading round 9a, PDFs rebuilt
Six independent readers with a controller each read the carousel, the
summaries, the README, the opening of chapter 1 and chapter 10. No
measured number was wrong. Corrected: the scale requirement on slide 6
(25 %, not 5 %), which requirements can fell a solution (slide 18),
that not every number has a source, that all source checks were made by
language models, and a caveat on the advice to build stepwise. The
report is 155 pages.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 06:43:28 +01:00
f271f11715
docs(rapport): appendices with the parameters and the change list, the reference list, and the two-page summary
Appendix B, appendix C and the reference list are generated from the frozen
parameter file, the pre-registration and the source bank. Citations link to
their item in the list. The two-page summary states only what the summary in
the report states. Draft PDFs of the report and the summary are in pdf/.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 21:24:36 +01:00
20d784942b
docs(rapport): chapters 7 and 9 and the summary, and chapters 3 to 5 corrected after independent readers
Chapter 7 holds what the sources of area 27 say against the frozen distributions, theme by theme.
Chapter 9 renders the two lists of what the model does not do, with the wording after the change of
the hypothesis. The summary gives only the main run's verdicts, the comparison M7 without a verdict
and the main known limitations, every measured number read from the result files.

Four independent readers read chapters 3, 4 and 5 against the pre-registration, the specification,
the parameter file, the code and the source bank: 3 stoppers, 30 "should be corrected" and 52 "can
wait", all entered. The 54 equations are unchanged. The four remaining placeholders in chapters 4
and 5 are gone.

Chapter 8 now lists four things the specification says shall be reported that are not computed, and
two observations from area 27 that lie outside the frozen ranges in favour of nuclear power. The
sentence about n_0 is corrected after (S2). The explanation of row 21 in chapter 6 is corrected from
the figures in the file.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 20:55:52 +01:00
293faebfbe
docs(forhandsregistrering): deviation entered after the results, the ranking of the ownership forms is not shown for other weightings and limits
Approved by the operator 2026-11-14. The criteria, the rule and the limit of 25 % are unchanged.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 20:10:27 +01:00
ab31ea4d30
docs: the operator's decision on the ranking of the ownership forms under other weightings and limits, a known limitation in the first version
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 20:02:21 +01:00
4defd09580
docs(rapport): chapter 6, the results, generated from the eight result files, with ten figures
Every measured number in the prose and the tables is read from data/resultater/ by
rapport/lag_resultater.py (modules in rapport/resultater/) and carries file, path and raw
value in rapport/generert/tall.json. Chapter 8 says what is missing: the ranking of the
ownership forms under other weightings and limits is not computed, and the reproduction
is on one machine.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 19:41:41 +01:00
f337efb075
docs(rapport): six corrections in chapters 1 and 8 after an independent reading against the pre-registration
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:58:04 +01:00
a91989db64
docs(rapport): the caveat of the pre-registration verbatim in chapter 8, and 123 entries checked by the project
Approved by the operator 2026-11-14.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:34:53 +01:00
339161df18
docs(rapport): LaTeX skeleton of the report, the summary and the carousel, with placeholders for every result
Foreword, chapters 1, 2 and 8 and the appendix from equation to code are
written from the pre-registration, the review log and the map; the rest are
stubs. bygg.sh builds with a time limit per LaTeX run. Not yet read against
the sources by the session.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:29:57 +01:00