Commit graph

7 commits

Author SHA1 Message Date
54081343ec
fix(report): twelve small errors from the last reader test
Summary: the median changes little "with the five solutions"; the verdict
on profitability is read on the median and the share above zero; every
parameter has a source, is an open assumption or is a choice of set-up.
Report: the same sentence in chapter 1; in section 8.4 the reference points
to section 4.1, "svakt" is struck, and the eight data files are those of the
main run and the command after it. Carousel: slides 21, 25 and 26 (four
simplifications, short form), with tighter spacing on 21 and 26. README:
four simplifications. Page: the column is the average over the lifetime of
the IT equipment, and the dots lie near or below zero.

No measured number changes. Every changed word was approved by the owner
2026-11-24. 179, 4 and 28 pages.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 20:49:23 +01:00
6443c4f151
docs(rapport): corrections after the fresh-reader test (round 9d)
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.

- grid-connected nuclear now stands next to the dedicated plant where
  the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
  (new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
  "not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
  the state's rate, requirements that hold by construction, the two
  build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt

The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:29:08 +01:00
fe83f9f194
docs(rapport): close the gaps from critique round 9c
Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.

- Summary, two-page summary, chapters 1 and 10, README: what the test did
  and did not try, what the 1.1 % share rests on, the interest rate, the
  build pace, and the lesson on a dedicated nuclear plant as what the
  comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
  probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
  are not made, what "independent" means in the project, that the
  pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
  parameter): long leases, the largest compute deals, recent reactor
  costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.

Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 15:58:13 +01:00
af3daaa6a9
docs(rapport): wording corrected after reading round 9a, PDFs rebuilt
Six independent readers with a controller each read the carousel, the
summaries, the README, the opening of chapter 1 and chapter 10. No
measured number was wrong. Corrected: the scale requirement on slide 6
(25 %, not 5 %), which requirements can fell a solution (slide 18),
that not every number has a source, that all source checks were made by
language models, and a caveat on the advice to build stepwise. The
report is 155 pages.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 06:43:28 +01:00
d02ef2e76c
docs: plain-language summary, conclusion chapter, introduction and README
The two-page summary and the summary in the report now open with the answer,
the numbers that carry it, what could change it and what was learned, after
the approved wording of the submission. New chapter 10 gives the conclusion,
chapter 1 opens with what is asked and why, and the README states the result.
Every measured number is still read from the result files.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 21:47:21 +01:00
f337efb075
docs(rapport): six corrections in chapters 1 and 8 after an independent reading against the pre-registration
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:58:04 +01:00
339161df18
docs(rapport): LaTeX skeleton of the report, the summary and the carousel, with placeholders for every result
Foreword, chapters 1, 2 and 8 and the appendix from equation to code are
written from the pre-registration, the review log and the map; the rest are
stubs. bygg.sh builds with a time limit per LaTeX run. Not yet read against
the sources by the session.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:29:57 +01:00