With the rate of the Ministry of Finance's circular the net present value turns positive for one facility
with new renewable power in the scenario that counts (row 16 of the sensitivity list: median +87.6 bn kr),
while the scale is still not reached. Two phrases are cut to keep the length.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The conclusion, measures 2 and 3 and the status sentence are approved (the operator, 2026-11-14). Measure 3
now says «not a dedicated nuclear plant», which is what the 0.1 % measures, for one facility. The form was
opened in a browser: a text field without a link button or a stated length limit, and up to ten PDF
attachments of 10 MB each, which must be accessible PDFs.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The figures were held against dommer.json, tidslinje.json, eierformer.json and terskler.json once more.
Corrected: the median with new renewable power is -19 bn kr (-19.49, was -20); 500 MW is in operation in
2039 in the median (was 2040); the state's present value is negative in 97 to 100 % of the draws (lowest
share 96.99 %, was «at least 97 %»); scale, overruns and construction time matter most with a dedicated
nuclear plant (was «for nuclear power»). No result is removed. The fourth knowledge gap is left out
(the operator, 2026-11-14).
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The hypothesis does not hold in any of the six scenarios. The figures are read off dommer.json,
tidslinje.json, eierformer.json and terskler.json on step 1 (frozen numbers, 10 000 draws) while the
run still makes folsomheter.json; no sentence rests on the sensitivity list. The wording is a proposal
for the operator.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>