Author SHA1 Message Date
16aefee608
docs: clarifications 144 to 149, the plan for the additional analyses
Written and committed before any of them is coded or computed, as the
project owner approved 2026-11-23. Clarification 144 holds the frame: what
an additional analysis is, the rule for the order, that everything started
is reported, what was known beforehand, and all fifteen with a decision.
145 to 148 fix the four that are done now on the frozen numbers (expected
net present value, half the construction time for small units with the
free choice of unit size, no displacement in the grid queue, net present
value by term), and 149 how they are run, checked and stored in
data/tillegg/. Row in appendix C, dated entry in the pre-registration,
report rebuilt (172 pages).

No verdict, threshold, parameter, draw or result file changes.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 21:21:32 +01:00
d7828d9306
docs(rapport): the carousel after round 9e, approved by the project owner
Ten slides have new wording after the second fresh-reader test (review log
part 31), and slides 26 and 27 say 1,237 source entries. Every change is
listed in the session's table for the project owner, who approved them.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 20:02:22 +01:00
502cdaa550
docs(rapport): corrections after the second fresh-reader test (round 9e)
Four new readers, each with a controller, read the corrected PDFs, the
carousel, the post and the text of the results page. No measured number was
wrong. The summaries, chapters 6, 8 and 10 and the results page now say that
twelve years from decision to grid applies to the Emirates only, that a full
yes was in practice out of reach, that the first-year cash flow is a year
without chip purchases, where the cost range for nuclear power comes from and
what the committee behind it concluded, that the study behind the dedicated
plant found the grid as backup cheaper, and what the cooling water and
emission columns on the results page are. The source bank counts 1,237
entries. PDFs rebuilt (171 and 2 pages); the results page rebuilt (7,213
numbers). The carousel is not part of this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 19:33:19 +01:00
b5ce07e0b6
docs(rapport): the carousel after rounds 9c and 9d, approved by the project owner
49 changes from the previously approved carousel: grid-connected
nuclear next to the dedicated plant, caveats in both directions, the
price rule, the scale target, what holds by definition, and the page
count (171). 28 slides, rebuilt and copied to pdf/. The post is moved
to 2026-11-26; a dated addendum in review log part 30 says so.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:46:36 +01:00
6443c4f151
docs(rapport): corrections after the fresh-reader test (round 9d)
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.

- grid-connected nuclear now stands next to the dedicated plant where
  the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
  (new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
  "not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
  the state's rate, requirements that hold by construction, the two
  build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt

The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:29:08 +01:00
fe83f9f194
docs(rapport): close the gaps from critique round 9c
Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.

- Summary, two-page summary, chapters 1 and 10, README: what the test did
  and did not try, what the 1.1 % share rests on, the interest rate, the
  build pace, and the lesson on a dedicated nuclear plant as what the
  comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
  probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
  are not made, what "independent" means in the project, that the
  pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
  parameter): long leases, the largest compute deals, recent reactor
  costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.

Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 15:58:13 +01:00
63acecf584
docs(rapport): corrections after reading round 9b, PDFs rebuilt
Chapter 4 no longer says the amount of spent fuel is reported. Chapter 6.5
says which way the median goes with the required return, with the part that
follows from the equations and the part that is not explained. Chapter 8 lists
seven things that are not computed, the known-answer misses and three notes on
the frozen parameter file, which is unchanged. Chapter 7 separates measured
learning rates from estimates. The reference list leaves out work notes and
lists the entries another entry points to. README and tool configuration say
Python 3.12. The report is 158 pages; slide 27 follows.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 10:31:39 +01:00
af3daaa6a9
docs(rapport): wording corrected after reading round 9a, PDFs rebuilt
Six independent readers with a controller each read the carousel, the
summaries, the README, the opening of chapter 1 and chapter 10. No
measured number was wrong. Corrected: the scale requirement on slide 6
(25 %, not 5 %), which requirements can fell a solution (slide 18),
that not every number has a source, that all source checks were made by
language models, and a caveat on the advice to build stepwise. The
report is 155 pages.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 06:43:28 +01:00
9809d60ac0
feat(rapport): the LinkedIn carousel, 28 slides with every number read from the result files
The slides follow the text the operator approved 2026-11-22, verbatim. Every
measured number is a \tall key, also in the figures. The new module
rapport/resultater/karusell.py adds 41 derived keys (all beginning with
karusell.) and writes the figure geometry to rapport/generert/. The 6 886
existing keys are unchanged, and the report and the summary build as before.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-22 21:05:15 +01:00
2b20f81152
docs(rapport): the price threshold as per cent above the model's path in the summaries and the conclusion
A derived number per solution and scenario, (k - 1) * 100, replaces
'1,068 times as high' with '7 % above' where a reader meets it first.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 22:14:13 +01:00
078f6d9f9c
docs(rapport): appendix C as a one-page table of the changes to the pre-registration
The verbatim list of changes was the project's working log. The appendix now
shows what was changed, when, before or after the results, and the effect on
the test as each entry states it, and points to the full list in the
pre-registration. The generator for the verbatim list is removed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 22:08:04 +01:00
d02ef2e76c
docs: plain-language summary, conclusion chapter, introduction and README
The two-page summary and the summary in the report now open with the answer,
the numbers that carry it, what could change it and what was learned, after
the approved wording of the submission. New chapter 10 gives the conclusion,
chapter 1 opens with what is asked and why, and the README states the result.
Every measured number is still read from the result files.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 21:47:21 +01:00
f271f11715
docs(rapport): appendices with the parameters and the change list, the reference list, and the two-page summary
Appendix B, appendix C and the reference list are generated from the frozen
parameter file, the pre-registration and the source bank. Citations link to
their item in the list. The two-page summary states only what the summary in
the report states. Draft PDFs of the report and the summary are in pdf/.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>