124 parameters for the model in modell/spesifikasjon.md (draft 3), all
amounts in real 2025 kroner, one distribution per parameter, each with
the source bank entries it rests on. 80 follow from confirmed entries,
1 is derived from them, 35 are open assumptions with a stated range and
8 are set-up choices. The file also fixes the conversion rule, the
Monte Carlo set-up and the list of sensitivities.
Frozen before anything is computed and before any code exists. The file
is not edited after this commit; a change is a deviation with a new
checksum and a dated entry in the pre-registration.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Draft 3 has 47 equations. Changes follow the pre-read of draft 2
(44 findings), two independent reviews of draft 3 (55 and 22 findings)
and an independent control of the corrections (39 findings). Each
finding was checked by the project before it was corrected; the log
says what was done with each.
Main changes: all parameters in 2025 kroner; explicit cash flows per
solution; the price of compute set per MW sold, so that unsold capacity
is not charged to Norway alone; power plants on the grid are never
credited a surplus (S45); the reading of the Norwegian nuclear cost
range is drawn (S46); dimensioning, build-out and residual value are
specified. Eight proposed clarifications of the pre-registration are
listed in chapter 15 and are not entered there.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Approved by the project owner after two independent reviews of the
model specification, before anything is computed and before any code
exists: overall verdict, M2 against the price of compute, verdict per
price scenario with fixed build-out paths, the M4 requirement, M3 in
normal and dry years, the M6 numerator and year, a symmetric M7
threshold, a grid-purchase reference run, and the limit for state risk.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Draft 1 was read by two independent reviewers (a subject reviewer and a
devil's advocate). Draft 2 corrects the equations they found wrong
(levelised price, token cost unit, welfare sign, double counting) and
models off-grid operation with unit size limits and reserve units.
Findings that touch the pre-registered criteria are listed as open
decisions, not applied.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>