Second round of the source bank, before the parameter freeze: eight
tracks for the open points 10-17 in the specification (areas 13-20),
the three unconfirmed entries in area 11 and the outdated entries
(area 21). One researcher and one independent verifier per track.
286 new entries (157 confirmed, 93 corrected, 36 added by verifiers,
1 not confirmed). 57 verified corrections applied to existing entries,
each with the previous wording kept in the control line. 53 entries
checked by the project itself against the primary source (Egenkontroll).
README and the cross-area review updated.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Approved by the project owner after two independent reviews of the
model specification, before anything is computed and before any code
exists: overall verdict, M2 against the price of compute, verdict per
price scenario with fixed build-out paths, the M4 requirement, M3 in
normal and dry years, the M6 numerator and year, a symmetric M7
threshold, a grid-purchase reference run, and the limit for state risk.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Draft 1 was read by two independent reviewers (a subject reviewer and a
devil's advocate). Draft 2 corrects the equations they found wrong
(levelised price, token cost unit, welfare sign, double counting) and
models off-grid operation with unit size limits and reserve units.
Findings that touch the pre-registered criteria are listed as open
decisions, not applied.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>