The hypothesis is the venture (state-owned AI data centres as a source of
income as oil has been), not dedicated nuclear power, which becomes one of
the power solutions that are compared on equal terms. M1 to M6, the
thresholds, the parameter file and the draws are unchanged. The sections on
part II and M7 are rewritten in a session of their own before any result.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Entered before anything is computed. The row for standard contract terms
follows the frozen list and can favour the hypothesis' solution; it is
named for that reason and the row says so.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
M6 is exempt from the requirement of a named condition (changes 17), a
threshold counts only when the quantity demonstrably affects the outcome
(chi-square test at the 0.1 % level, sharpens 5), and a threshold in the
required return for power must hold in both halves of the required return
for compute. Entered before anything is computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 18 to 20 of the pre-registration, approved 2026-11-13
before anything is computed: part II has no verdict when no step can
be built, a single facility cannot be the 25 % step (clarification 104
of the specification, not coded yet), and the paths the ownership
forms are compared on.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarification 17 of the pre-registration, approved 2026-11-13 before
anything is computed: the conditions of a solution can be named when every
target it holds under conditions in has one that can be named, and the
condition behind M5 counts as named and is written out with the source.
Dated entry with the reason under «Endringer». The grid connection of a
nuclear plant stays out of the business economics, and the report says so.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
One deviation, before anything is computed. modell/parametere.json version 1.1,
SHA-256 4b8809bc56abdd8b2872b89eecffd8453199eef627110276dd10aecea8307f16.
- Thirteen new quantities for chapter 17 (module size, lead time and cap of
the first stage, the response to lower demand, the two demand scenarios,
the emissions of the power the compute would otherwise use, cooling water).
- Seven new sensitivities, and the three lines clarifications 53, 64 and 65
announced (the median in 2025 kroner, the rate for the state's cash flow,
the settlement priced with the cost of equity).
- None of the 124 frozen parameters has a new value, range or distribution.
Four things changed from the candidates after the source check (chapter 17.8
and part 9 of the review log): the seawater range is 119-168, zero freshwater
use is an open assumption, the largest data centre case in the register is
180 MW, and 2.4 years is one dated case.
BREAKING CHANGE: the loader refuses the file until its checksum constant and
the stored draws are updated; that is the next commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Approved 2026-11-12, after the choices were put forward with the independent
reader's findings and before anything is computed. The parameter file is
unchanged.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Chapter 17 of the specification (S48-S54): solution T, "stepwise", in two
versions (T-F and T-K), the timeline, a threshold and two labelled scenarios
for compute on the users' own machines, emissions with a deduction, and
cooling water. The pre-registration gets T-F and T-K in the table of
alternatives, in M7 and in clarifications 1, 3, 10 and 11, new clarifications
13-16 and a dated entry. An independent reader coded the chapter from the text
alone in three rounds; the findings and what was done are in part 8 of the
review log.
Nothing is computed. The parameter file is unchanged (checksum 4582835...f6cc);
the new quantities are candidates until the deviation from the freeze. The
eight choices in 17.7 are put to the project owner and not yet approved.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The operator approved the four recommendations after the source work in
areas 22-26: a new stepwise solution T in two variants measured on the same
terms as A, B and C (A must also beat T in part II), no gas power, on-device
AI tested as a threshold and two marked scenarios without changing the
verdict that counts, and the basis for avoided emissions and cooling water.
Decided before anything is computed. The alternatives table, the wording of
M7 and how T is computed follow with the specification. The frozen
parameters are unchanged.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The operator approved the corrections to the comparison of ownership forms
on 2026-11-12, before anything is computed, and decided that the addition to
the direction is worked in before the run over the draws is coded.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The operator's four answers of 2026-11-12: clarifications 41-60 approved,
clarifications 55-59 entered in the pre-registration as clarifications 9-12,
the addition to the direction entered, and the announced deviation from the
parameter freeze recorded. The result of the large comparison of part 5c is
in part 6 of the review log.
Clarifications 62-67 correct the weaknesses of clarification 61 in the
comparison of ownership forms: residual value at the final year, the levies,
the private owners, the rate the state's cash flow is valued with, and the
cost of capital before tax. An independent reader coded them from the text in
three rounds (20, 5 and 2 findings); part 7 of the review log. Clarification
68 holds the sources' figures for M5 (i), checked against the downloaded
primary sources, and 69 the figures shown next to each verdict.
The parameter file is unchanged. Nothing is computed for the hypothesis.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The project owner approved the eight proposed clarifications of the
pre-registered criteria on 2026-11-12, as recommended, after the
parameter freeze and before any code or result exists. They are entered
under «Presiseringer» with a dated entry and the reason for each under
«Endringer». Three wordings in the criteria text are aligned with them.
The specification now refers to them as clarifications instead of
proposals, and the rule for conditions uses the 10th to 90th percentile.
Equations and parameters are unchanged; modell/parametere.json keeps its
checksum.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Commit 01b27fa, SHA-256 4582835…f6cc. The criteria are unchanged.
Eight proposed clarifications are with the project owner and are not
entered.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Approved by the project owner after two independent reviews of the
model specification, before anything is computed and before any code
exists: overall verdict, M2 against the price of compute, verdict per
price scenario with fixed build-out paths, the M4 requirement, M3 in
normal and dry years, the M6 numerator and year, a symmetric M7
threshold, a grid-purchase reference run, and the limit for state risk.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>