90 entries in two files (series building and reactor size; timelines,
power purchase agreements and the state's role), one researcher and one
independent controller per file. Made after the freeze and before any
result; no parameter is changed. Review log part 19 holds the findings
against the frozen ranges.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The 30 entries chapter 17 of the specification cites that the project had not
looked up itself are now checked against the primary source: 23 in the files
the researchers and controllers downloaded, 2 in pages fetched now, 1 through
a search tool, and 4 in Statnett's register of grid connection cases, read in
the browser filter by filter. Each entry says what was looked up and what was
not. K26-006 also records which scenario its rows belong to.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Third round of source work, before anything is computed: what can be in
operation within a few years on the existing grid (22), power sources with
short lead time (23), stepwise build-up and switching power solution over
time (24), AI compute on users' own machines (25), and the two quantities
the model lacked parameters for: avoided emissions and cooling water (26).
188 entries, one researcher and one independent verifier per area:
114 confirmed, 52 corrected, 22 added by the verifiers, none unconfirmed.
22 load-bearing entries were checked a third time against the primary
source and carry an "Egenkontroll" line.
The model, the frozen parameters and the pre-registration are unchanged.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
K12-001: the method article behind the Argonne study (Hanna et al. 2024) read
in text; what the test needs is quoted, and what could not be read is stated.
K16-011: the committee's spreadsheet reproduces 132.2 øre/kWh but gives 222.1,
not 219, for the high scenario. K11-004: NVE's investment figure for hydro
already includes interest during construction.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Second round of the source bank, before the parameter freeze: eight
tracks for the open points 10-17 in the specification (areas 13-20),
the three unconfirmed entries in area 11 and the outdated entries
(area 21). One researcher and one independent verifier per track.
286 new entries (157 confirmed, 93 corrected, 36 added by verifiers,
1 not confirmed). 57 verified corrections applied to existing entries,
each with the previous wording kept in the control line. 53 entries
checked by the project itself against the primary source (Egenkontroll).
README and the cross-area review updated.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>