T-K is the same path as T-F in every draw where no module gets nuclear
power, so the two tie exactly and the rule of 135 counted those draws as
«none». Found on made-up draws, before any result. The comparison now gives
best alone, shared and none.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The source bank says what the test is (the market investor test on the terms
the state gives) and assesses none of the four forms: the proposal is
«usikker» for all four. The guard of clarification 127 stays until it is
approved.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written before the code. M7 gives the share of the draws in which each of the
five solutions is best, with no verdict of its own on A, and part II falls
away, after the operator's decision of 2026-11-13. M1 to M6, the thresholds,
the step and part I are unchanged. Nothing is computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
What the coding and an independent reader found in clarifications 126 to
133, the reproduction of the made-up reference files, the measured time for
the 42 rows, and the changed hypothesis in CLAUDE.md and CHANGELOG.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
grunnlag.py holds what a run needs besides the model code, from a made-up
basis file or from the freeze (which stops until the EEA assessment is
written down). datafiler.py writes the six files in a fixed format without
rounding and compares two folders. verktoy.py is the command line:
hovedkjoring, kontroll, scenario, folsomhet, terskel, sammenlign,
arbeidskopi. tests/oppdiktet holds a made-up basis of 200 draws and the files
written from it; they are reproduced byte for byte with 1 and 8 processes and
in a new process. Nothing is computed on the frozen parameters.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Every S-number of the specification points to the functions named after it
and, where it is put together over the years or the draws, to the functions
that do so. A test holds the stored map against the code.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The hypothesis is the venture (state-owned AI data centres as a source of
income as oil has been), not dedicated nuclear power, which becomes one of
the power solutions that are compared on equal terms. M1 to M6, the
thresholds, the parameter file and the draws are unchanged. The sections on
part II and M7 are rewritten in a session of their own before any result.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written before the tools are coded. Nothing is computed and no value in the
parameter file changes.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Entered before anything is computed. The row for standard contract terms
follows the frozen list and can favour the hypothesis' solution; it is
named for that reason and the row says so.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
42 rows from the 37 lines: each row is the main run with one change, run
on the main run's step for the solutions it applies to and put in the
fixed table next to the main run. New switches in dimensjoner and
regn_program for lines 4, 7, 8, 10, 12, 13, 16, 17, 18, 20 and 21, the
cost factor of line 28 in the ownership pass, and the state's cash flow
next to M6. With the switches off every figure is unchanged to the last
digit. Made-up draws only; nothing is computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Line 8 uses the design values in S8, line 10 is the step alone and can
favour A (put to the operator), line 27 gives A and B' new units, the tax
cost on all capital holds the shared nuclear units, and the rows read in
other scenarios stand next to the main run in the same scenario.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
42 rows from 37 lines, read on the main run's step. Settles the lines the
text did not say enough about: the markup for nuclear power (4), the unit
size in A (7, 8), the income factor by standard terms (10), lasting and
fading scarcity (12, 13), the stepped rate (16), the tax cost on all
capital (17), the subsidy element with the state's rate (18), the reserve
above the dimensioning fault (21) and efficiency by ownership form (28).
Written before the reader and the code.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
A threshold counts when the quantity has a source, its first-order index
for the condition is above the chi-square limit, and, for rho_N, the target
holds under the condition in each half of the draws by rho_D. For a solution
whose conditions can be named, the share of the draws that meets the chosen
conditions together is given, and the share of them in which M1 to M4 hold.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
M6 is exempt from the requirement of a named condition (changes 17), a
threshold counts only when the quantity demonstrably affects the outcome
(chi-square test at the 0.1 % level, sharpens 5), and a threshold in the
required return for power must hold in both halves of the required return
for compute. Entered before anything is computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 105 to 111, on invented outcomes and made-up draws only. The price
threshold runs the model with the price multiplied by a factor; the thresholds in
a quantity, the indices and two of the surfaces are read from the outcomes per draw.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 18 to 20 of the pre-registration, approved 2026-11-13
before anything is computed: part II has no verdict when no step can
be built, a single facility cannot be the 25 % step (clarification 104
of the specification, not coded yet), and the paths the ownership
forms are compared on.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarification 103 holds what the reader found in clarifications 88 to
101 and how it is read; part 14 of the review log holds the
reconciliation (120 made-up draws through both codes and 600 runs of
invented outcomes, no difference) and what is not done. README,
CHANGELOG and CLAUDE.md describe the new module.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
A reading made when the run was coded, before the reader's code was
opened. It fills in the pre-registration and is put to the project owner.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
For every draw the seven solutions on every step of the ladder in six
scenarios, with the outcomes the verdicts need; the verdicts per target,
the step they are read on, part I and part II; S50 summarised over the
draws; and the ownership forms on that step. Tested on made-up draws and
invented outcomes only. Written and committed before the independent
reader's code was opened.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The part of clarification 60 that concerns the run: what is computed per
draw, on which steps and in which scenarios, how a path that cannot be
built is recorded, which paths the ownership forms are compared on, and
the timeline over the draws. Written before the run was coded and before
anything is computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarification 17 of the pre-registration, approved 2026-11-13 before
anything is computed: the conditions of a solution can be named when every
target it holds under conditions in has one that can be named, and the
condition behind M5 counts as named and is written out with the source.
Dated entry with the reason under «Endringer». The grid connection of a
nuclear plant stays out of the business economics, and the report says so.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 88 to 94 in chapter 16: M5 and the verdicts with five
solutions, the three sensitivities of chapter 17.8 that are switches (full
displacement in the first stage, modules of 50 and 200 MW, new renewable
power counted from 2031), the water for the data centres' own use next to
S54, and the wording of clarifications 82 to 87. Clarification 93, which
conditions can be named when M5 holds under conditions, is a proposal put to
the project owner and not settled.
Part 13 of the review log: the project's own control, the reconciliation
against a new independent reader's code (396 615 comparisons of M5 and the
verdicts on invented outcomes, 2 523 made-up paths and 10.1 million figures
for the sensitivities, no difference), the reader's findings and what was
done with each. Nothing has been computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The ladder, part I and M7 now cover A, B, C, T-F and T-K: A is best when it
can be built and beats each of the four others that can. M5 holds by
definition for T-F and judges T-K as nuclear power on every step.
Switches for the sensitivities: full displacement in the first stage
(delta_V = 1 for the modules started within the grid that exists, in S11,
S23, S24, the grid investment and V), new renewable power counted from a
later year for C and T, and Inndata.med for modules of 50 and 200 MW. Next
to S54 the withdrawal with sea water only for the nuclear production the
data centres themselves use.
With the switches off every figure for all seven solutions is unchanged to
the last digit (267 made-up paths, 516 817 lines, byte for byte). Not yet
reconciled against the independent reader's code.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 82 to 87 in chapter 16: the power cost per module (S11), the factor of S51 in
S19, S27, S31 and S42, what the level of S42 means with modules, scale and the business
economics for T, and one known property the independent reader found: the nuclear plant's own
grid connection is not in the business economics, which favours B, B' and T-K there. It is
put to the project owner and not changed. Clarification 77 said every cost is the same with
and without a loss of demand; the capacity cost is the exception, and the text now says so.
Part 12 of the review log: the reconciliation against the reader's code (1 760 made-up paths,
6.6 million figures, no difference), the reader's findings and what was done, and the faults
found in the project's own code. No figure in the parameter file is changed, and no result
has been computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The power cost per module (S11): a renewable module with its own portfolio and grid
connection, as a facility in C; the nuclear modules of T-K on the programme's units, as the
facilities in B, with only the nuclear modules that use power in the denominator. Tariff,
building, IT hardware and residual value per module with P_m. The units' cash flow is shared
among the nuclear modules operated that year, never on the renewable modules.
The factor of S51 stands per vintage in S19, S27 and S42 and in the disconnection arm a
business pays; S31 gets it through the revenue and F_a of the cash flow. Without a loss, and
for A, B, B', C and R, every figure of chapters 7 to 9 is unchanged to the last digit (282
made-up paths, 151 525 lines of figures compared byte for byte).
The technologies of a facility are now kept in the plants' own order. As a set of names their
order differed from run to run, and with it the last digit of every sum over them in C.
The refusal of T and of a loss of demand (krev_uten_tillegget) is removed. Run on made-up
numbers only; no result for the hypothesis has been computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Everything per module, renewable modules with their own portfolio, the nuclear
modules of T-K on shared units, S41 counted to the first unit. The factor of
S51 enters the revenue and the disconnection arm of S47. S53 and S54 are put
together over a programme for all solutions. Present values are exactly
rounded sums, so the same computation gives the same last digit every time.
The chapters after the cash flow refuse T and a loss of demand for now.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 76 to 81 in chapter 16: T per module through the power system
and the cash flow, the loss of demand in the revenue, S53 and S54 over a
programme, two sensitivities, and two corrections in chapter 17.8. Part 11 of
the review log: the new independent reader's findings and the reconciliation.
The parameter file is unchanged and nothing has been computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
utbyggingsplan_trinnvis follows chapter 17.1: the grid balance of the
first stage, the payment condition for a module's power plants, S49,
and in T-K the two stocks of chips and the queue for replacements.
tidslinje gives MW IT in operation per type of power (S50). S48-S54
are pure functions in ligninger.py, and Inndata carries the new
quantities, the scenarios for the loss of demand and the paths of
u_alt. lag_plan returns a Trinnvisplan for T-F and T-K; regn_program
refuses T until it is taken through the cash flow.
Tested on made-up numbers only (59 new tests, hand-computed build-outs).
Nothing is computed for the hypothesis.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 70 to 75 in chapter 16: nuclear power before new grid is
refused, the grid balance in years with an export stop, the payment
condition for a module's power plants, two sensitivities of 17.8, the
paths for the loss of demand and for u_alt, and the timeline (S50).
None of them changes a number for values within the ranges of the
parameter file. The parameter file and the pre-registration are unchanged.
Part 10 of the review log: the project's code for the build-out of T-F
and T-K and for S48-S54 against the independent reader's code, on
made-up sets only: 42 000 build-outs and 20 000 sets for S51-S54
without a difference. Nothing is computed for the hypothesis.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The loader knows the new checksum and the units of the new quantities
(g CO2 per kWh, cubic metres per MWh). 10 000 draws of 91 quantities with the
same seed; the four new ones are the last columns. All columns have new
numbers, because the random numbers are laid out row by row. The stream for
yearly events is byte for byte the same; only its description records the new
checksum. Tests for the counts, the new quantities and the checksum in the
pre-registration. README, CHANGELOG and CLAUDE.md updated.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
One deviation, before anything is computed. modell/parametere.json version 1.1,
SHA-256 4b8809bc56abdd8b2872b89eecffd8453199eef627110276dd10aecea8307f16.
- Thirteen new quantities for chapter 17 (module size, lead time and cap of
the first stage, the response to lower demand, the two demand scenarios,
the emissions of the power the compute would otherwise use, cooling water).
- Seven new sensitivities, and the three lines clarifications 53, 64 and 65
announced (the median in 2025 kroner, the rate for the state's cash flow,
the settlement priced with the cost of equity).
- None of the 124 frozen parameters has a new value, range or distribution.
Four things changed from the candidates after the source check (chapter 17.8
and part 9 of the review log): the seawater range is 119-168, zero freshwater
use is an open assumption, the largest data centre case in the register is
180 MW, and 2.4 years is one dated case.
BREAKING CHANGE: the loader refuses the file until its checksum constant and
the stored draws are updated; that is the next commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>