Commit graph

22 commits

Author SHA1 Message Date
e926ed91e1
docs: the conditions that count and the sensitivity list in README, CHANGELOG and CLAUDE.md
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:31:13 +01:00
9d6a9836ec
docs: thresholds and Sobol indices settled against an independent reader's code (clarification 114, review log part 15)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 18:47:03 +01:00
b4aa608d6d
docs: enter the project owner's decisions on clarifications 98, 102 and 103
Clarifications 18 to 20 of the pre-registration, approved 2026-11-13
before anything is computed: part II has no verdict when no step can
be built, a single facility cannot be the 25 % step (clarification 104
of the specification, not coded yet), and the paths the ownership
forms are compared on.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 17:35:18 +01:00
f5b386ff21
docs: the run over the draws settled against an independent reader's code
Clarification 103 holds what the reader found in clarifications 88 to
101 and how it is read; part 14 of the review log holds the
reconciliation (120 made-up draws through both codes and 600 runs of
invented outcomes, no difference) and what is not done. README,
CHANGELOG and CLAUDE.md describe the new module.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 15:48:11 +01:00
7f7cacb4eb
docs: enter the project owner's decisions on clarifications 87 and 93
Clarification 17 of the pre-registration, approved 2026-11-13 before
anything is computed: the conditions of a solution can be named when every
target it holds under conditions in has one that can be named, and the
condition behind M5 counts as named and is written out with the source.
Dated entry with the reason under «Endringer». The grid connection of a
nuclear plant stays out of the business economics, and the report says so.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 14:53:27 +01:00
64d24c7800
docs: describe M5 and the verdicts for five solutions and the sensitivities that are switches
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 14:26:13 +01:00
79a00f3464
docs: describe solution T through the levelised cost, ownership and scale
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 09:48:37 +01:00
e0db6ab4b7
docs: describe solution T through the cash flow, S53 and S54
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 00:37:50 +01:00
4c9539d68a
docs: describe the code for the build-out of solution T
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 23:55:57 +01:00
ea26cd4226
feat(trekninger): read parameter file 1.1 and store the new draws
The loader knows the new checksum and the units of the new quantities
(g CO2 per kWh, cubic metres per MWh). 10 000 draws of 91 quantities with the
same seed; the four new ones are the last columns. All columns have new
numbers, because the random numbers are laid out row by row. The stream for
yearly events is byte for byte the same; only its description records the new
checksum. Tests for the counts, the new quantities and the checksum in the
pre-registration. README, CHANGELOG and CLAUDE.md updated.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 23:07:09 +01:00
cc0c306bac
docs(modell): write the addition to the direction into the specification and the pre-registration
Chapter 17 of the specification (S48-S54): solution T, "stepwise", in two
versions (T-F and T-K), the timeline, a threshold and two labelled scenarios
for compute on the users' own machines, emissions with a deduction, and
cooling water. The pre-registration gets T-F and T-K in the table of
alternatives, in M7 and in clarifications 1, 3, 10 and 11, new clarifications
13-16 and a dated entry. An independent reader coded the chapter from the text
alone in three rounds; the findings and what was done are in part 8 of the
review log.

Nothing is computed. The parameter file is unchanged (checksum 4582835...f6cc);
the new quantities are candidates until the deviation from the freeze. The
eight choices in 17.7 are put to the project owner and not yet approved.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 22:39:36 +01:00
27dcd8790a
docs(kilder): add areas 22-26 for the addition to the direction
Third round of source work, before anything is computed: what can be in
operation within a few years on the existing grid (22), power sources with
short lead time (23), stepwise build-up and switching power solution over
time (24), AI compute on users' own machines (25), and the two quantities
the model lacked parameters for: avoided emissions and cooling water (26).

188 entries, one researcher and one independent verifier per area:
114 confirmed, 52 corrected, 22 added by the verifiers, none unconfirmed.
22 load-bearing entries were checked a third time against the primary
source and carry an "Egenkontroll" line.

The model, the frozen parameters and the pre-registration are unchanged.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 21:38:16 +01:00
14c2a68f1d
docs(modell): record the operator's approval of clarifications 62-67
The operator approved the corrections to the comparison of ownership forms
on 2026-11-12, before anything is computed, and decided that the addition to
the direction is worked in before the run over the draws is coded.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 20:19:47 +01:00
946adad62c
docs(modell): enter the operator's answers and correct the comparison of ownership forms
The operator's four answers of 2026-11-12: clarifications 41-60 approved,
clarifications 55-59 entered in the pre-registration as clarifications 9-12,
the addition to the direction entered, and the announced deviation from the
parameter freeze recorded. The result of the large comparison of part 5c is
in part 6 of the review log.

Clarifications 62-67 correct the weaknesses of clarification 61 in the
comparison of ownership forms: residual value at the final year, the levies,
the private owners, the rate the state's cash flow is valued with, and the
cost of capital before tax. An independent reader coded them from the text in
three rounds (20, 5 and 2 findings); part 7 of the review log. Clarification
68 holds the sources' figures for M5 (i), checked against the downloaded
primary sources, and 69 the figures shown next to each verdict.

The parameter file is unchanged. Nothing is computed for the hypothesis.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 17:17:13 +01:00
a705842f88
docs: describe the settled code for chapters 7 to 11
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 14:33:50 +01:00
e216702d69
feat(kode): first coding of business economics, ownership, scale, environment and verdicts
Chapters 7 to 11 of the specification, on the made-up set only:

- nivaaisert: the power cost per facility, year and vintage on levelised
  form (S9, S11 with clarifications 2, 11, 13 and 15), S15, S19, S27, S42
- eierskap: the business cash flow with every asset booked, tax, S28, S29
  and S30 for the four ownership forms, the criteria over the draws
- skala: S31 year by year, the first year with stable operation, M6
- miljo: S32 year by year, the rules of M5 (i) and (ii)
- dommer: S37, the verdict per target, the step of the ladder, the overall
  verdicts; tested on invented outcomes
- kontantstrom: each asset is recorded as it is paid, and the price of
  compute exposes the competitor's cost and the markup

This is an intermediate step. The readings are not settled: an independent
reader is coding the same from the specification alone, a first comparison
agrees on the levelised cost, S19, S42, the cash flows, M3 and M4 and
differs on depreciation at the final year, tax, debt and two definitions.
Chapter 16 gets the clarifications before any result is computed.
Nothing is computed for the hypothesis; the parameter file is unchanged.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 12:45:54 +01:00
326b80d8d1
docs: describe the build-out, the cash flow and the event stream
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 11:58:25 +01:00
aee22b9101
docs: describe the code, the commands and the new conventions
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 10:08:48 +01:00
28eaa80f09
docs(forhandsregistrering): enter the eight approved clarifications
The project owner approved the eight proposed clarifications of the
pre-registered criteria on 2026-11-12, as recommended, after the
parameter freeze and before any code or result exists. They are entered
under «Presiseringer» with a dated entry and the reason for each under
«Endringer». Three wordings in the criteria text are aligned with them.

The specification now refers to them as clarifications instead of
proposals, and the rule for conditions uses the 10th to 90th percentile.
Equations and parameters are unchanged; modell/parametere.json keeps its
checksum.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 09:07:33 +01:00
9e3feb367e
docs(modell): add specification draft 3 and review log
Draft 3 has 47 equations. Changes follow the pre-read of draft 2
(44 findings), two independent reviews of draft 3 (55 and 22 findings)
and an independent control of the corrections (39 findings). Each
finding was checked by the project before it was corrected; the log
says what was done with each.

Main changes: all parameters in 2025 kroner; explicit cash flows per
solution; the price of compute set per MW sold, so that unsold capacity
is not charged to Norway alone; power plants on the grid are never
credited a surplus (S45); the reading of the Norwegian nuclear cost
range is drawn (S46); dimensioning, build-out and residual value are
specified. Eight proposed clarifications of the pre-registration are
listed in chapter 15 and are not entered there.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 00:57:41 +01:00
5a4d9b0072
docs(modell): add model specification draft 2 and review log
Draft 1 was read by two independent reviewers (a subject reviewer and a
devil's advocate). Draft 2 corrects the equations they found wrong
(levelised price, token cost unit, welfare sign, double counting) and
models off-grid operation with unit size limits and reserve units.
Findings that touch the pre-registered criteria are listed as open
decisions, not applied.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 22:20:04 +01:00
5f60c681ed
feat: initial commit with pre-registration and source bank
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 21:55:45 +01:00