Approved by the operator 2026-11-14. The criteria, the rule and the limit of 25 % are unchanged.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written by two helpers from the specification, the pre-registration and the
parameter file while the main run was going; no result is in them. The
equations are compared mechanically with the specification. Review log part 21
says what is checked and what is not, and the technical trial of tilleggsfiler
on 16 frozen draws.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written while the main run was going, before any result file existed and before
any result was read. One command, the head of the six files, the checksums in
tillegg.json, and a stop when the folder holds an innhold.json with another head.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Precisions 15 and 16 require S53 and S54 reported per solution; none of the
six files holds them. Fixed while the main run goes, before any result is read.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
No deviation from the freeze for the two findings of review log part 19
(the operator, 2026-11-14). The five files are written one at a time by one
command, from a separate copy of the code on one commit, after a technical
trial on the first 16 draws. A seventh file, fordelinger.json, is fixed
before anything is computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
90 entries in two files (series building and reactor size; timelines,
power purchase agreements and the state's role), one researcher and one
independent controller per file. Made after the freeze and before any
result; no parameter is changed. Review log part 19 holds the findings
against the frozen ranges.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The operator approved both 2026-11-14, before anything is computed.
The hypothesis has one part and one verdict; M7 is a comparison of the
five power solutions with no thresholds and no verdict; clarification 18
has lapsed. The old wording is kept under «Endringer». Clarification 136
is marked approved, and 139 records the approvals and that a net present
value that is not a number is rejected.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
T-K is the same path as T-F in every draw where no module gets nuclear
power, so the two tie exactly and the rule of 135 counted those draws as
«none». Found on made-up draws, before any result. The comparison now gives
best alone, shared and none.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The source bank says what the test is (the market investor test on the terms
the state gives) and assesses none of the four forms: the proposal is
«usikker» for all four. The guard of clarification 127 stays until it is
approved.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written before the code. M7 gives the share of the draws in which each of the
five solutions is best, with no verdict of its own on A, and part II falls
away, after the operator's decision of 2026-11-13. M1 to M6, the thresholds,
the step and part I are unchanged. Nothing is computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
What the coding and an independent reader found in clarifications 126 to
133, the reproduction of the made-up reference files, the measured time for
the 42 rows, and the changed hypothesis in CLAUDE.md and CHANGELOG.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Every S-number of the specification points to the functions named after it
and, where it is put together over the years or the draws, to the functions
that do so. A test holds the stored map against the code.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Written before the tools are coded. Nothing is computed and no value in the
parameter file changes.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Line 8 uses the design values in S8, line 10 is the step alone and can
favour A (put to the operator), line 27 gives A and B' new units, the tax
cost on all capital holds the shared nuclear units, and the rows read in
other scenarios stand next to the main run in the same scenario.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
42 rows from 37 lines, read on the main run's step. Settles the lines the
text did not say enough about: the markup for nuclear power (4), the unit
size in A (7, 8), the income factor by standard terms (10), lasting and
fading scarcity (12, 13), the stepped rate (16), the tax cost on all
capital (17), the subsidy element with the state's rate (18), the reserve
above the dimensioning fault (21) and efficiency by ownership form (28).
Written before the reader and the code.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
A threshold counts when the quantity has a source, its first-order index
for the condition is above the chi-square limit, and, for rho_N, the target
holds under the condition in each half of the draws by rho_D. For a solution
whose conditions can be named, the share of the draws that meets the chosen
conditions together is given, and the share of them in which M1 to M4 hold.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 18 to 20 of the pre-registration, approved 2026-11-13
before anything is computed: part II has no verdict when no step can
be built, a single facility cannot be the 25 % step (clarification 104
of the specification, not coded yet), and the paths the ownership
forms are compared on.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarification 103 holds what the reader found in clarifications 88 to
101 and how it is read; part 14 of the review log holds the
reconciliation (120 made-up draws through both codes and 600 runs of
invented outcomes, no difference) and what is not done. README,
CHANGELOG and CLAUDE.md describe the new module.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
A reading made when the run was coded, before the reader's code was
opened. It fills in the pre-registration and is put to the project owner.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The part of clarification 60 that concerns the run: what is computed per
draw, on which steps and in which scenarios, how a path that cannot be
built is recorded, which paths the ownership forms are compared on, and
the timeline over the draws. Written before the run was coded and before
anything is computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarification 17 of the pre-registration, approved 2026-11-13 before
anything is computed: the conditions of a solution can be named when every
target it holds under conditions in has one that can be named, and the
condition behind M5 counts as named and is written out with the source.
Dated entry with the reason under «Endringer». The grid connection of a
nuclear plant stays out of the business economics, and the report says so.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 88 to 94 in chapter 16: M5 and the verdicts with five
solutions, the three sensitivities of chapter 17.8 that are switches (full
displacement in the first stage, modules of 50 and 200 MW, new renewable
power counted from 2031), the water for the data centres' own use next to
S54, and the wording of clarifications 82 to 87. Clarification 93, which
conditions can be named when M5 holds under conditions, is a proposal put to
the project owner and not settled.
Part 13 of the review log: the project's own control, the reconciliation
against a new independent reader's code (396 615 comparisons of M5 and the
verdicts on invented outcomes, 2 523 made-up paths and 10.1 million figures
for the sensitivities, no difference), the reader's findings and what was
done with each. Nothing has been computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 82 to 87 in chapter 16: the power cost per module (S11), the factor of S51 in
S19, S27, S31 and S42, what the level of S42 means with modules, scale and the business
economics for T, and one known property the independent reader found: the nuclear plant's own
grid connection is not in the business economics, which favours B, B' and T-K there. It is
put to the project owner and not changed. Clarification 77 said every cost is the same with
and without a loss of demand; the capacity cost is the exception, and the text now says so.
Part 12 of the review log: the reconciliation against the reader's code (1 760 made-up paths,
6.6 million figures, no difference), the reader's findings and what was done, and the faults
found in the project's own code. No figure in the parameter file is changed, and no result
has been computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 76 to 81 in chapter 16: T per module through the power system
and the cash flow, the loss of demand in the revenue, S53 and S54 over a
programme, two sensitivities, and two corrections in chapter 17.8. Part 11 of
the review log: the new independent reader's findings and the reconciliation.
The parameter file is unchanged and nothing has been computed.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Clarifications 70 to 75 in chapter 16: nuclear power before new grid is
refused, the grid balance in years with an export stop, the payment
condition for a module's power plants, two sensitivities of 17.8, the
paths for the loss of demand and for u_alt, and the timeline (S50).
None of them changes a number for values within the ranges of the
parameter file. The parameter file and the pre-registration are unchanged.
Part 10 of the review log: the project's code for the build-out of T-F
and T-K and for S48-S54 against the independent reader's code, on
made-up sets only: 42 000 build-outs and 20 000 sets for S51-S54
without a difference. Nothing is computed for the hypothesis.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
One deviation, before anything is computed. modell/parametere.json version 1.1,
SHA-256 4b8809bc56abdd8b2872b89eecffd8453199eef627110276dd10aecea8307f16.
- Thirteen new quantities for chapter 17 (module size, lead time and cap of
the first stage, the response to lower demand, the two demand scenarios,
the emissions of the power the compute would otherwise use, cooling water).
- Seven new sensitivities, and the three lines clarifications 53, 64 and 65
announced (the median in 2025 kroner, the rate for the state's cash flow,
the settlement priced with the cost of equity).
- None of the 124 frozen parameters has a new value, range or distribution.
Four things changed from the candidates after the source check (chapter 17.8
and part 9 of the review log): the seawater range is 119-168, zero freshwater
use is an open assumption, the largest data centre case in the register is
180 MW, and 2.4 years is one dated case.
BREAKING CHANGE: the loader refuses the file until its checksum constant and
the stored draws are updated; that is the next commit.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Approved 2026-11-12, after the choices were put forward with the independent
reader's findings and before anything is computed. The parameter file is
unchanged.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
Chapter 17 of the specification (S48-S54): solution T, "stepwise", in two
versions (T-F and T-K), the timeline, a threshold and two labelled scenarios
for compute on the users' own machines, emissions with a deduction, and
cooling water. The pre-registration gets T-F and T-K in the table of
alternatives, in M7 and in clarifications 1, 3, 10 and 11, new clarifications
13-16 and a dated entry. An independent reader coded the chapter from the text
alone in three rounds; the findings and what was done are in part 8 of the
review log.
Nothing is computed. The parameter file is unchanged (checksum 4582835...f6cc);
the new quantities are candidates until the deviation from the freeze. The
eight choices in 17.7 are put to the project owner and not yet approved.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
The operator approved the corrections to the comparison of ownership forms
on 2026-11-12, before anything is computed, and decided that the addition to
the direction is worked in before the run over the draws is coded.
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>