Commit graph

93 commits

Author SHA1 Message Date
1c9afbd146
feat(verktoy): the command tilleggsfiler writes fordelinger.json and miljo.json
Clarifications 140 (e), 141 and 142. fordelinger.json is read off the run over
the draws; miljo.json has a pass of its own with the same build-out and
programme per scenario, and S32, S53 and S54 from the functions of miljo. None
of the modules behind the six files of the main run is edited. 30 tests on
made-up numbers; not run on the freeze.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:58:04 +01:00
de8fa552d2
docs(spesifikasjon): clarification 142, how fordelinger.json and miljo.json are made
Written while the main run was going, before any result file existed and before
any result was read. One command, the head of the six files, the checksums in
tillegg.json, and a stop when the folder holds an innhold.json with another head.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:58:03 +01:00
a91989db64
docs(rapport): the caveat of the pre-registration verbatim in chapter 8, and 123 entries checked by the project
Approved by the operator 2026-11-14.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:34:53 +01:00
339161df18
docs(rapport): LaTeX skeleton of the report, the summary and the carousel, with placeholders for every result
Foreword, chapters 1, 2 and 8 and the appendix from equation to code are
written from the pre-registration, the review log and the map; the rest are
stubs. bygg.sh builds with a time limit per LaTeX run. Not yet read against
the sources by the session.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:29:57 +01:00
8d7f348b2a
docs(spesifikasjon): clarification 141, avoided emissions and cooling water get a data file
Precisions 15 and 16 require S53 and S54 reported per solution; none of the
six files holds them. Fixed while the main run goes, before any result is read.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:29:56 +01:00
b406abbfff
docs: the main run on the frozen numbers is started; review log part 20 and a first draft of the submission
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:13:47 +01:00
085b64282b
docs(spesifikasjon): clarification 140, how the main run on the frozen numbers is made
No deviation from the freeze for the two findings of review log part 19
(the operator, 2026-11-14). The five files are written one at a time by one
command, from a separate copy of the code on one commit, after a technical
trial on the first 16 draws. A seventh file, fordelinger.json, is fixed
before anything is computed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:10:00 +01:00
65a60ee113
docs(kilder): area 27, what researchers and expert bodies say, held against the frozen assumptions
90 entries in two files (series building and reactor size; timelines,
power purchase agreements and the state's role), one researcher and one
independent controller per file. Made after the freeze and before any
result; no parameter is changed. Review log part 19 holds the findings
against the frozen ranges.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 07:38:59 +01:00
8a93d8b163
docs: the operator's approvals of 2026-11-14 in the review log, CHANGELOG and CLAUDE.md
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 06:51:34 +01:00
6a51c4f4d2
feat(grunnlag): the approved EEA assessment as a fixed table, and M7 rejects a net present value that is not a number (clarifications 136 and 139)
fra_frys takes the assessment of clarification 136 («usikker» for all
four ownership forms) and has no guard any more; it is still not called
before part 6. beste_per_trekning raises on NaN, where the best would
depend on the order of the solutions.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 06:43:45 +01:00
9b6e65c512
docs(forhandsregistrering): the approved wording after the changed hypothesis, and the EEA assessment (clarification 139)
The operator approved both 2026-11-14, before anything is computed.
The hypothesis has one part and one verdict; M7 is a comparison of the
five power solutions with no thresholds and no verdict; clarification 18
has lapsed. The old wording is kept under «Endringer». Clarification 136
is marked approved, and 139 records the approvals and that a net present
value that is not a number is rejected.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 06:41:59 +01:00
ebe3bf9515
docs: clarification 138, review log part 18, and the changed hypothesis in README, CHANGELOG and CLAUDE.md
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 23:03:05 +01:00
5a54fba628
feat(dommer): the power solutions compared on equal terms, and the axes of the surfaces (clarifications 134, 135 and 137)
M7 gives, for each of the five solutions, the share of the draws in which it
is best alone and in which it shares the place, with no verdict on A; part II
and the thresholds for M7 are gone. T-F and T-K share the place where they
are the same path. The surfaces carry the classes along their axes, and
kontroll prints a line per file. The made-up reference files are
regenerated: everything outside the comparison is unchanged to the last
digit. Nothing is computed on the frozen parameters.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 23:03:05 +01:00
d650ce219e
docs(modell): a shared highest value in the comparison of the power solutions (clarification 137)
T-K is the same path as T-F in every draw where no module gets nuclear
power, so the two tie exactly and the rule of 135 counted those draws as
«none». Found on made-up draws, before any result. The comparison now gives
best alone, shared and none.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 22:43:29 +01:00
d5c153e834
docs(modell): the EEA assessment of the ownership forms, a proposal awaiting the operator (clarification 136)
The source bank says what the test is (the market investor test on the terms
the state gives) and assesses none of the four forms: the proposal is
«usikker» for all four. The guard of clarification 127 stays until it is
approved.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 22:23:43 +01:00
950db9fc85
docs(modell): the power solutions are compared on equal terms, and the axes of the surfaces (clarifications 134 and 135)
Written before the code. M7 gives the share of the draws in which each of the
five solutions is best, with no verdict of its own on A, and part II falls
away, after the operator's decision of 2026-11-13. M1 to M6, the thresholds,
the step and part I are unchanged. Nothing is computed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 22:19:28 +01:00
9bf44f85aa
docs(modell): the operator's reproduction in a fresh clone, on the same machine
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 22:15:02 +01:00
11f312f1ac
docs: clarification 133, review log part 17, and the tools in README, CHANGELOG and CLAUDE.md
What the coding and an independent reader found in clarifications 126 to
133, the reproduction of the made-up reference files, the measured time for
the 42 rows, and the changed hypothesis in CLAUDE.md and CHANGELOG.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 22:01:25 +01:00
7dd3edc68a
feat(verktoy): the tools of chapter 12 and the data files of the main run, on made-up numbers (clarifications 126 to 133)
grunnlag.py holds what a run needs besides the model code, from a made-up
basis file or from the freeze (which stops until the EEA assessment is
written down). datafiler.py writes the six files in a fixed format without
rounding and compares two folders. verktoy.py is the command line:
hovedkjoring, kontroll, scenario, folsomhet, terskel, sammenlign,
arbeidskopi. tests/oppdiktet holds a made-up basis of 200 draws and the files
written from it; they are reproduced byte for byte with 1 and 8 processes and
in a new process. Nothing is computed on the frozen parameters.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 21:55:03 +01:00
aff6624c5e
feat(kart): the map from equation to function, generated from the code (clarification 131)
Every S-number of the specification points to the functions named after it
and, where it is put together over the years or the draws, to the functions
that do so. A test holds the stored map against the code.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:53:31 +01:00
c32015c5a5
docs(prereg): the operator changed the hypothesis 2026-11-13, before anything is computed
The hypothesis is the venture (state-owned AI data centres as a source of
income as oil has been), not dedicated nuclear power, which becomes one of
the power solutions that are compared on equal terms. M1 to M6, the
thresholds, the parameter file and the draws are unchanged. The sections on
part II and M7 are rewritten in a session of their own before any result.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:53:22 +01:00
bce42b91ff
docs(modell): the tools of chapter 12, the data files and what byte for byte is compared against (clarifications 126 to 132)
Written before the tools are coded. Nothing is computed and no value in the
parameter file changes.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:45:06 +01:00
5f139a0698
docs: the approval of the sensitivity readings in CLAUDE.md and CHANGELOG
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:36:00 +01:00
550f02d0a9
feat(folsomheter): the row for standard contract terms carries the note that it can favour A (clarification 125)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:36:00 +01:00
f4df22aadf
docs(modell): the readings of the sensitivity list are approved (clarification 125)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:35:59 +01:00
9f25916c2b
docs(prereg): the operator approved the readings of the sensitivity list 2026-11-13
Entered before anything is computed. The row for standard contract terms
follows the frozen list and can favour the hypothesis' solution; it is
named for that reason and the row says so.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:35:59 +01:00
e926ed91e1
docs: the conditions that count and the sensitivity list in README, CHANGELOG and CLAUDE.md
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:31:13 +01:00
45aaffcb69
feat(folsomheter): the sensitivity list through the run over the draws, with eleven new switches in the model code
42 rows from the 37 lines: each row is the main run with one change, run
on the main run's step for the solutions it applies to and put in the
fixed table next to the main run. New switches in dimensjoner and
regn_program for lines 4, 7, 8, 10, 12, 13, 16, 17, 18, 20 and 21, the
cost factor of line 28 in the ownership pass, and the state's cash flow
next to M6. With the switches off every figure is unchanged to the last
digit. Made-up draws only; nothing is computed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:31:12 +01:00
5360e768cf
docs(modell): the sensitivity list reconciled against an independent reader's code (clarification 124, review log part 16)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:31:11 +01:00
2375a4bcb4
docs(modell): what the reader found in clarifications 112 to 123 (clarification 124)
Line 8 uses the design values in S8, line 10 is the step alone and can
favour A (put to the operator), line 27 gives A and B' new units, the tax
cost on all capital holds the shared nuclear units, and the rows read in
other scenarios stand next to the main run in the same scenario.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:22:37 +01:00
b2997982ae
docs(modell): the sensitivity list through the run, line by line (clarifications 116 to 123)
42 rows from 37 lines, read on the main run's step. Settles the lines the
text did not say enough about: the markup for nuclear power (4), the unit
size in A (7, 8), the income factor by standard terms (10), lasting and
fading scarcity (12, 13), the stepped rate (16), the tax cost on all
capital (17), the subsidy element with the state's rate (18), the reserve
above the dimensioning fault (21) and efficiency by ownership form (28).
Written before the reader and the code.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 19:43:35 +01:00
1da369daa4
feat(terskler): demonstrated effect, the halves of rho_D and the conditions taken together (clarification 115)
A threshold counts when the quantity has a source, its first-order index
for the condition is above the chi-square limit, and, for rho_N, the target
holds under the condition in each half of the draws by rho_D. For a solution
whose conditions can be named, the share of the draws that meets the chosen
conditions together is given, and the share of them in which M1 to M4 hold.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 19:39:36 +01:00
0508114bdd
docs(prereg): clarifications 21 to 23, approved by the operator 2026-11-13
M6 is exempt from the requirement of a named condition (changes 17), a
threshold counts only when the quantity demonstrably affects the outcome
(chi-square test at the 0.1 % level, sharpens 5), and a threshold in the
required return for power must hold in both halves of the required return
for compute. Entered before anything is computed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 19:39:36 +01:00
0ef716ea32
docs: the reader's measurement that net present value does not fall with the price (review log part 15)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 18:48:11 +01:00
9d6a9836ec
docs: thresholds and Sobol indices settled against an independent reader's code (clarification 114, review log part 15)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 18:47:03 +01:00
925df404a0
feat(sobol): the number of classes with draws, for the expectation without an effect
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 18:47:03 +01:00
9f25aad7de
docs(modell): how the sensitivities are read, the decision year 2030 and facilities of 300 MW (clarifications 112 and 113)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 18:00:42 +01:00
8d13501653
feat(kjoring): thresholds, the conditions of part I, Sobol indices and threshold surfaces
Clarifications 105 to 111, on invented outcomes and made-up draws only. The price
threshold runs the model with the price multiplied by a factor; the thresholds in
a quantity, the indices and two of the surfaces are read from the outcomes per draw.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 17:57:52 +01:00
7e3ab007f8
docs(modell): thresholds, conditions, Sobol indices and threshold surfaces (clarifications 105 to 111)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 17:46:37 +01:00
28a0911825
feat(dommer): the step with a single facility cannot be the 25 % step (clarification 104)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 17:46:37 +01:00
b4aa608d6d
docs: enter the project owner's decisions on clarifications 98, 102 and 103
Clarifications 18 to 20 of the pre-registration, approved 2026-11-13
before anything is computed: part II has no verdict when no step can
be built, a single facility cannot be the 25 % step (clarification 104
of the specification, not coded yet), and the paths the ownership
forms are compared on.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 17:35:18 +01:00
f5b386ff21
docs: the run over the draws settled against an independent reader's code
Clarification 103 holds what the reader found in clarifications 88 to
101 and how it is read; part 14 of the review log holds the
reconciliation (120 made-up draws through both codes and 600 runs of
invented outcomes, no difference) and what is not done. README,
CHANGELOG and CLAUDE.md describe the new module.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 15:48:11 +01:00
1a3a2fd5a8
test(kjoring): the median when exactly half the draws cannot be built
And the docstring of the percentile says how it is computed
(clarification 103).

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 15:48:11 +01:00
7f978ccb1c
docs(modell): part II when no step can be built (clarification 102)
A reading made when the run was coded, before the reader's code was
opened. It fills in the pre-registration and is put to the project owner.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 15:22:10 +01:00
8ab69c7619
feat(kjoring): the run over the draws, the verdicts put together and the timeline
For every draw the seven solutions on every step of the ladder in six
scenarios, with the outcomes the verdicts need; the verdicts per target,
the step they are read on, part I and part II; S50 summarised over the
draws; and the ownership forms on that step. Tested on made-up draws and
invented outcomes only. Written and committed before the independent
reader's code was opened.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 15:22:09 +01:00
6d79865204
docs(modell): settle how the solutions are run over the draws (clarifications 95-101)
The part of clarification 60 that concerns the run: what is computed per
draw, on which steps and in which scenarios, how a path that cannot be
built is recorded, which paths the ownership forms are compared on, and
the timeline over the draws. Written before the run was coded and before
anything is computed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 15:07:45 +01:00
7f7cacb4eb
docs: enter the project owner's decisions on clarifications 87 and 93
Clarification 17 of the pre-registration, approved 2026-11-13 before
anything is computed: the conditions of a solution can be named when every
target it holds under conditions in has one that can be named, and the
condition behind M5 counts as named and is written out with the source.
Dated entry with the reason under «Endringer». The grid connection of a
nuclear plant stays out of the business economics, and the report says so.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 14:53:27 +01:00
64d24c7800
docs: describe M5 and the verdicts for five solutions and the sensitivities that are switches
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 14:26:13 +01:00
88dfb1ce03
docs(modell): settle the readings made when M5 and the verdicts were coded for five solutions
Clarifications 88 to 94 in chapter 16: M5 and the verdicts with five
solutions, the three sensitivities of chapter 17.8 that are switches (full
displacement in the first stage, modules of 50 and 200 MW, new renewable
power counted from 2031), the water for the data centres' own use next to
S54, and the wording of clarifications 82 to 87. Clarification 93, which
conditions can be named when M5 holds under conditions, is a proposal put to
the project owner and not settled.

Part 13 of the review log: the project's own control, the reconciliation
against a new independent reader's code (396 615 comparisons of M5 and the
verdicts on invented outcomes, 2 523 made-up paths and 10.1 million figures
for the sensitivities, no difference), the reader's findings and what was
done with each. Nothing has been computed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 14:26:13 +01:00
fe2b2131f3
feat(dommer): five solutions in M5 and the verdicts, and three sensitivities of chapter 17.8 as switches
The ladder, part I and M7 now cover A, B, C, T-F and T-K: A is best when it
can be built and beats each of the four others that can. M5 holds by
definition for T-F and judges T-K as nuclear power on every step.

Switches for the sensitivities: full displacement in the first stage
(delta_V = 1 for the modules started within the grid that exists, in S11,
S23, S24, the grid investment and V), new renewable power counted from a
later year for C and T, and Inndata.med for modules of 50 and 200 MW. Next
to S54 the withdrawal with sea water only for the nuclear production the
data centres themselves use.

With the switches off every figure for all seven solutions is unchanged to
the last digit (267 made-up paths, 516 817 lines, byte for byte). Not yet
reconciled against the independent reader's code.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 13:41:29 +01:00