Commit graph

11 commits

Author SHA1 Message Date
6443c4f151
docs(rapport): corrections after the fresh-reader test (round 9d)
Six new readers who had seen nothing, two of them well-informed
supporters of nuclear power, read the built PDFs, the carousel proposal
and the post; a controller tried to refute each finding. 73 findings:
30 confirmed, 42 partly, 1 rejected. No measured number, equation or
code was wrong. One sentence in chapter 4 was (interest during the data
centre's construction time does not apply equally to Norway and the
competitor); clarification 143 corrects it and chapter 8 lists it as
not computed.

- grid-connected nuclear now stands next to the dedicated plant where
  the conclusion is drawn; caveats are listed in both directions
- what the dedicated plant is in the model; Barakah in chapter 7 and 8
  (new entry K28-011)
- the direction of the discount rate is explained from S26 instead of
  "not explained"; what remains unexplained is still said outright
- the price rule, the numerator and denominator of the scale target,
  the state's rate, requirements that hold by construction, the two
  build-rate caps
- the rest from reading rounds 9a and 9b; title of K06-016 corrected
- the web page rebuilt (7211 numbers checked against the result files)
- report 171 pages, summary 2 pages (set in 10 pt); PDFs rebuilt

The carousel is unchanged: its new wording is a proposal until the
project owner has approved it.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:29:08 +01:00
fe83f9f194
docs(rapport): close the gaps from critique round 9c
Six critics and six controllers read the report 2026-11-23 and raised 83
objections; none shows a measured number, an equation or the code to be
wrong. This commit writes the missing reservations where the reader meets
the number, and says what is not computed.

- Summary, two-page summary, chapters 1 and 10, README: what the test did
  and did not try, what the 1.1 % share rests on, the interest rate, the
  build pace, and the lesson on a dedicated nuclear plant as what the
  comparison shows (no verdict, as the pre-registration says).
- Chapters 2 to 6: reservations at the numbers (shares are not
  probabilities, the scenario is a choice, sensitivities one at a time).
- Chapters 8 and 9, appendix C: computations the critics asked for that
  are not made, what "independent" means in the project, that the
  pre-registration was not in a public register.
- Source bank area 28 (10 entries, after the results, feeding no
  parameter): long leases, the largest compute deals, recent reactor
  costs; cited in chapters 4, 7 and 8. K09-004 gets its NOU quote.
- PDFs rebuilt: report 164 pages, summary 2 pages.

Every change was read by a controller and the corrections entered; keys,
source entries and quotes were checked again by script. The carousel is
not changed in this commit.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 15:58:13 +01:00
63acecf584
docs(rapport): corrections after reading round 9b, PDFs rebuilt
Chapter 4 no longer says the amount of spent fuel is reported. Chapter 6.5
says which way the median goes with the required return, with the part that
follows from the equations and the part that is not explained. Chapter 8 lists
seven things that are not computed, the known-answer misses and three notes on
the frozen parameter file, which is unchanged. Chapter 7 separates measured
learning rates from estimates. The reference list leaves out work notes and
lists the entries another entry points to. README and tool configuration say
Python 3.12. The report is 158 pages; slide 27 follows.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 10:31:39 +01:00
65a60ee113
docs(kilder): area 27, what researchers and expert bodies say, held against the frozen assumptions
90 entries in two files (series building and reactor size; timelines,
power purchase agreements and the state's role), one researcher and one
independent controller per file. Made after the freeze and before any
result; no parameter is changed. Review log part 19 holds the findings
against the frozen ranges.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 07:38:59 +01:00
3419748b5b
docs(kilder): record the project's own check of 30 entries behind chapter 17
The 30 entries chapter 17 of the specification cites that the project had not
looked up itself are now checked against the primary source: 23 in the files
the researchers and controllers downloaded, 2 in pages fetched now, 1 through
a search tool, and 4 in Statnett's register of grid connection cases, read in
the browser filter by filter. Each entry says what was looked up and what was
not. K26-006 also records which scenario its rows belong to.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 23:07:08 +01:00
27dcd8790a
docs(kilder): add areas 22-26 for the addition to the direction
Third round of source work, before anything is computed: what can be in
operation within a few years on the existing grid (22), power sources with
short lead time (23), stepwise build-up and switching power solution over
time (24), AI compute on users' own machines (25), and the two quantities
the model lacked parameters for: avoided emissions and cooling water (26).

188 entries, one researcher and one independent verifier per area:
114 confirmed, 52 corrected, 22 added by the verifiers, none unconfirmed.
22 load-bearing entries were checked a third time against the primary
source and carry an "Egenkontroll" line.

The model, the frozen parameters and the pre-registration are unchanged.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 21:38:16 +01:00
946adad62c
docs(modell): enter the operator's answers and correct the comparison of ownership forms
The operator's four answers of 2026-11-12: clarifications 41-60 approved,
clarifications 55-59 entered in the pre-registration as clarifications 9-12,
the addition to the direction entered, and the announced deviation from the
parameter freeze recorded. The result of the large comparison of part 5c is
in part 6 of the review log.

Clarifications 62-67 correct the weaknesses of clarification 61 in the
comparison of ownership forms: residual value at the final year, the levies,
the private owners, the rate the state's cash flow is valued with, and the
cost of capital before tax. An independent reader coded them from the text in
three rounds (20, 5 and 2 findings); part 7 of the review log. Clarification
68 holds the sources' figures for M5 (i), checked against the downloaded
primary sources, and 69 the figures shown next to each verdict.

The parameter file is unchanged. Nothing is computed for the hypothesis.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 17:17:13 +01:00
0e7deb267d
docs(kilder): record primary-source readings behind the known-answer tests
K12-001: the method article behind the Argonne study (Hanna et al. 2024) read
in text; what the test needs is quoted, and what could not be read is stated.
K16-011: the committee's spreadsheet reproduces 132.2 øre/kWh but gives 222.1,
not 219, for the high scenario. K11-004: NVE's investment figure for hydro
already includes interest during construction.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 10:08:46 +01:00
75bf83a6e5
docs(kilder): record primary-source figures read during the review
Five entries get the figures the project itself read in the primary
source and that parameters now rest on: the remaining rows of table
5.17 in the consultant report (K16-002), the assumptions sheet of the
commission's spreadsheet (K16-012), all twelve power balances in NVE's
2035 scenarios (K21-087), the intermediate years of the carbon price
sensitivity paths (K09-014) and table 6-1 of the Argonne study (K12-001).

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 00:35:19 +01:00
94c65da1c7
docs(kilder): add targeted source work for the open parameters
Second round of the source bank, before the parameter freeze: eight
tracks for the open points 10-17 in the specification (areas 13-20),
the three unconfirmed entries in area 11 and the outdated entries
(area 21). One researcher and one independent verifier per track.

286 new entries (157 confirmed, 93 corrected, 36 added by verifiers,
1 not confirmed). 57 verified corrections applied to existing entries,
each with the previous wording kept in the control line. 53 entries
checked by the project itself against the primary source (Egenkontroll).
README and the cross-area review updated.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 23:53:52 +01:00
5f60c681ed
feat: initial commit with pre-registration and source bank
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 21:55:45 +01:00