Commit graph

50 commits

Author SHA1 Message Date
772d412941
docs: review log part 36, a reader and a controller on the corrected places
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 21:05:40 +01:00
4c05350ba9
docs: review log part 36, the corrections entered
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 20:49:24 +01:00
a1f61e859d
docs: review log part 36, the last test with fresh readers
Three readers and three controllers outside the repository on what goes out
2026-11-26 and on section 8.4: twelve small errors confirmed, none in a
measured number. None is corrected yet; they are listed as known.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 20:38:37 +01:00
cf53765dba
docs: review log part 36, the four-page summary and the page
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 20:13:22 +01:00
d5d7cf9533
docs: review log part 35, one more reader and a controller on the new paragraph
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 18:43:26 +01:00
8e7a9395e0
docs: review log part 34, preparedness and sovereignty in the conclusion
Review log part 34: area 29 and how its entries were checked, the three
fresh readers and what was changed after them, the session's own checks,
what is not checked, and the operator's yes to the corrected wording and
to the numbers on slides 26 and 27. Changelog and project instructions
brought in line.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 17:15:52 +01:00
d08a841df3
docs: review log part 33, the additional analyses in the report
Review log part 33: what was written, the session's own check of the 350
numbers and 313 table cells against the files, the new reader's findings
and what was done with them, what is not checked, and the operator's yes
to the wording. Changelog and project instructions brought in line.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 12:16:30 +01:00
3754917e0e
docs: review log part 32, the additional analyses on the frozen numbers
Checksums, the checks of clarifications 145, 146 e, 147 c and 148 c against
the main run's files (no deviation), the figures, and what is not checked.
Nothing is written in the report yet.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-24 07:13:02 +01:00
979c13f863
feat: the additional analyses as a module of their own
tilleggsanalyser.py computes clarifications 145, 146 and 148 on step 1
(the mean of the net present value with its standard error, half the
construction time for small units with the free choice of unit size, the
net present value in twenty terms), with a command line of its own. It
edits no other module. 40 tests on made-up numbers.

Clarification 150 holds what the builder and an independent reader found:
the reader coded the three from the text alone, and on made-up numbers the
net present value agreed to the last digit, the terms within 2e-15 and
the choice of unit in every case, also on 5 000 made-up cost tables.

Nothing is run on the frozen numbers.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 21:46:38 +01:00
16aefee608
docs: clarifications 144 to 149, the plan for the additional analyses
Written and committed before any of them is coded or computed, as the
project owner approved 2026-11-23. Clarification 144 holds the frame: what
an additional analysis is, the rule for the order, that everything started
is reported, what was known beforehand, and all fifteen with a decision.
145 to 148 fix the four that are done now on the frozen numbers (expected
net present value, half the construction time for small units with the
free choice of unit size, no displacement in the grid queue, net present
value by term), and 149 how they are run, checked and stored in
data/tillegg/. Row in appendix C, dated entry in the pre-registration,
report rebuilt (172 pages).

No verdict, threshold, parameter, draw or result file changes.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 21:21:32 +01:00
12cbfabd80
docs: the carousel after round 9e is approved, notes brought in line
The project owner approved the ten slides the same evening (d7828d9). The
project notes, the changelog and review log part 31 still called them a
proposal; they now say what was approved and that the carousel in pdf/ is
the approved one.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 20:11:22 +01:00
762b3ce0d5
docs: review log part 31, changelog and project notes
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 19:33:21 +01:00
b5ce07e0b6
docs(rapport): the carousel after rounds 9c and 9d, approved by the project owner
49 changes from the previously approved carousel: grid-connected
nuclear next to the dedicated plant, caveats in both directions, the
price rule, the scale target, what holds by definition, and the page
count (171). 28 slides, rebuilt and copied to pdf/. The post is moved
to 2026-11-26; a dated addendum in review log part 30 says so.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:46:36 +01:00
09c46c08cd
docs: review log part 30, changelog and project notes
Part 30 covers critique round 9c, the rest from 9a and 9b, the
fresh-reader test (round 9d), the explanation of the direction of the
discount rate and what was corrected, with what the session checked
itself and what it did not.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 18:29:10 +01:00
4bf8f26f4b
docs(innspill): mark the draft submission as never sent
The report and the two-page summary were sent to the ministry 2026-11-20
as they stood at 2b20f81, before reading rounds 9a and 9b. The operator
decided 2026-11-23 that no correction is sent. The wording of the draft
is untouched. Dated addition to review log part 29; README, CHANGELOG
and CLAUDE.md follow.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 12:24:42 +01:00
eae84e35ba
docs: review log part 29, reading round 9b and what was corrected
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 10:31:40 +01:00
99098bb7f9
docs: review log part 28, reading round 9a and what was corrected
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-23 06:43:28 +01:00
dbe82570d8
docs: link to the carousel and describe how it is built
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-22 21:05:16 +01:00
078f6d9f9c
docs(rapport): appendix C as a one-page table of the changes to the pre-registration
The verbatim list of changes was the project's working log. The appendix now
shows what was changed, when, before or after the results, and the effect on
the test as each entry states it, and points to the full list in the
pre-registration. The generator for the verbatim list is removed.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 22:08:04 +01:00
04689cdd33
docs: review log part 27, the plain-language texts checked and the repository made public
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 21:53:18 +01:00
214c54935e
docs: review log part 26, the appendices, the reference list and the two-page summary checked
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 21:24:36 +01:00
73fa883210
docs: review log part 23, the two extra files and the six files reproduced on the same machine
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 19:05:53 +01:00
8fb42518ce
docs: review log part 22, the main run is done: checksums, the submission held against the files, and the sensitivity list read once
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 14:07:40 +01:00
84139a7cc6
docs: review log part 21, and the knowledge gaps of the draft submission held against the later source rounds
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:58:05 +01:00
b406abbfff
docs: the main run on the frozen numbers is started; review log part 20 and a first draft of the submission
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 09:13:47 +01:00
65a60ee113
docs(kilder): area 27, what researchers and expert bodies say, held against the frozen assumptions
90 entries in two files (series building and reactor size; timelines,
power purchase agreements and the state's role), one researcher and one
independent controller per file. Made after the freeze and before any
result; no parameter is changed. Review log part 19 holds the findings
against the frozen ranges.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 07:38:59 +01:00
8a93d8b163
docs: the operator's approvals of 2026-11-14 in the review log, CHANGELOG and CLAUDE.md
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-14 06:51:34 +01:00
ebe3bf9515
docs: clarification 138, review log part 18, and the changed hypothesis in README, CHANGELOG and CLAUDE.md
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 23:03:05 +01:00
11f312f1ac
docs: clarification 133, review log part 17, and the tools in README, CHANGELOG and CLAUDE.md
What the coding and an independent reader found in clarifications 126 to
133, the reproduction of the made-up reference files, the measured time for
the 42 rows, and the changed hypothesis in CLAUDE.md and CHANGELOG.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 22:01:25 +01:00
5f139a0698
docs: the approval of the sensitivity readings in CLAUDE.md and CHANGELOG
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:36:00 +01:00
e926ed91e1
docs: the conditions that count and the sensitivity list in README, CHANGELOG and CLAUDE.md
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 20:31:13 +01:00
9d6a9836ec
docs: thresholds and Sobol indices settled against an independent reader's code (clarification 114, review log part 15)
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 18:47:03 +01:00
b4aa608d6d
docs: enter the project owner's decisions on clarifications 98, 102 and 103
Clarifications 18 to 20 of the pre-registration, approved 2026-11-13
before anything is computed: part II has no verdict when no step can
be built, a single facility cannot be the 25 % step (clarification 104
of the specification, not coded yet), and the paths the ownership
forms are compared on.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 17:35:18 +01:00
f5b386ff21
docs: the run over the draws settled against an independent reader's code
Clarification 103 holds what the reader found in clarifications 88 to
101 and how it is read; part 14 of the review log holds the
reconciliation (120 made-up draws through both codes and 600 runs of
invented outcomes, no difference) and what is not done. README,
CHANGELOG and CLAUDE.md describe the new module.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 15:48:11 +01:00
7f7cacb4eb
docs: enter the project owner's decisions on clarifications 87 and 93
Clarification 17 of the pre-registration, approved 2026-11-13 before
anything is computed: the conditions of a solution can be named when every
target it holds under conditions in has one that can be named, and the
condition behind M5 counts as named and is written out with the source.
Dated entry with the reason under «Endringer». The grid connection of a
nuclear plant stays out of the business economics, and the report says so.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 14:53:27 +01:00
64d24c7800
docs: describe M5 and the verdicts for five solutions and the sensitivities that are switches
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 14:26:13 +01:00
79a00f3464
docs: describe solution T through the levelised cost, ownership and scale
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 09:48:37 +01:00
e0db6ab4b7
docs: describe solution T through the cash flow, S53 and S54
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-13 00:37:50 +01:00
4c9539d68a
docs: describe the code for the build-out of solution T
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 23:55:57 +01:00
ea26cd4226
feat(trekninger): read parameter file 1.1 and store the new draws
The loader knows the new checksum and the units of the new quantities
(g CO2 per kWh, cubic metres per MWh). 10 000 draws of 91 quantities with the
same seed; the four new ones are the last columns. All columns have new
numbers, because the random numbers are laid out row by row. The stream for
yearly events is byte for byte the same; only its description records the new
checksum. Tests for the counts, the new quantities and the checksum in the
pre-registration. README, CHANGELOG and CLAUDE.md updated.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 23:07:09 +01:00
cc0c306bac
docs(modell): write the addition to the direction into the specification and the pre-registration
Chapter 17 of the specification (S48-S54): solution T, "stepwise", in two
versions (T-F and T-K), the timeline, a threshold and two labelled scenarios
for compute on the users' own machines, emissions with a deduction, and
cooling water. The pre-registration gets T-F and T-K in the table of
alternatives, in M7 and in clarifications 1, 3, 10 and 11, new clarifications
13-16 and a dated entry. An independent reader coded the chapter from the text
alone in three rounds; the findings and what was done are in part 8 of the
review log.

Nothing is computed. The parameter file is unchanged (checksum 4582835...f6cc);
the new quantities are candidates until the deviation from the freeze. The
eight choices in 17.7 are put to the project owner and not yet approved.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 22:39:36 +01:00
14c2a68f1d
docs(modell): record the operator's approval of clarifications 62-67
The operator approved the corrections to the comparison of ownership forms
on 2026-11-12, before anything is computed, and decided that the addition to
the direction is worked in before the run over the draws is coded.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 20:19:47 +01:00
946adad62c
docs(modell): enter the operator's answers and correct the comparison of ownership forms
The operator's four answers of 2026-11-12: clarifications 41-60 approved,
clarifications 55-59 entered in the pre-registration as clarifications 9-12,
the addition to the direction entered, and the announced deviation from the
parameter freeze recorded. The result of the large comparison of part 5c is
in part 6 of the review log.

Clarifications 62-67 correct the weaknesses of clarification 61 in the
comparison of ownership forms: residual value at the final year, the levies,
the private owners, the rate the state's cash flow is valued with, and the
cost of capital before tax. An independent reader coded them from the text in
three rounds (20, 5 and 2 findings); part 7 of the review log. Clarification
68 holds the sources' figures for M5 (i), checked against the downloaded
primary sources, and 69 the figures shown next to each verdict.

The parameter file is unchanged. Nothing is computed for the hypothesis.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 17:17:13 +01:00
a705842f88
docs: describe the settled code for chapters 7 to 11
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 14:33:50 +01:00
326b80d8d1
docs: describe the build-out, the cash flow and the event stream
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 11:58:25 +01:00
aee22b9101
docs: describe the code, the commands and the new conventions
Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 10:08:48 +01:00
28eaa80f09
docs(forhandsregistrering): enter the eight approved clarifications
The project owner approved the eight proposed clarifications of the
pre-registered criteria on 2026-11-12, as recommended, after the
parameter freeze and before any code or result exists. They are entered
under «Presiseringer» with a dated entry and the reason for each under
«Endringer». Three wordings in the criteria text are aligned with them.

The specification now refers to them as clarifications instead of
proposals, and the rule for conditions uses the 10th to 90th percentile.
Equations and parameters are unchanged; modell/parametere.json keeps its
checksum.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 09:07:33 +01:00
50e7d1e119
docs(forhandsregistrering): record the parameter freeze and its checksum
Commit 01b27fa, SHA-256 4582835…f6cc. The criteria are unchanged.
Eight proposed clarifications are with the project owner and are not
entered.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-12 00:58:07 +01:00
5a4d9b0072
docs(modell): add model specification draft 2 and review log
Draft 1 was read by two independent reviewers (a subject reviewer and a
devil's advocate). Draft 2 corrects the equations they found wrong
(levelised price, token cost unit, welfare sign, double counting) and
models off-grid operation with unit size limits and reserve units.
Findings that touch the pre-registered criteria are listed as open
decisions, not applied.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 22:20:04 +01:00
5f60c681ed
feat: initial commit with pre-registration and source bank
Pre-registered criteria (M1-M7), approved before anything is computed,
and a source bank of 662 entries in twelve areas, each checked against
its primary source by an independent verifier.

Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
2026-11-11 21:55:45 +01:00